Timing Analysis with Qompass Sample Clauses

Timing Analysis with Qompass. The Qompass plug-in developed originally for schedulability analysis of XXXXX models, has been adapted and extended its application on EAST-ADL models. XXXXX models, originally input of the Qompass tool, contained a set of tasks and scheduling information (priorities, shared resources protocols, etc) where functions are mapped into tasks and signals are mapped into messages. The Qompass tool is able, on these tasks models, to perform response-time analysis. During MAENAD, however, it was immediately clear that the most detailed information provided by EAST-ADL did not cover the task set definition. In order to make the Qompass tool relevant for EAST-ADL models we worked on two different axes: (i) extend Qompass with so-called early-stage schedulability analysis, i.e. a schedulability assessment able to detect allocation errors preventing schedulability of the system and (ii) extend Qompass with an automatic transformation of EAST-ADL model to XXXXX functional models (without task set and scheduling information), containing end-to-end chains of function activations, estimated execution times for each function, end-to-end deadlines, and functional allocation to hardware nodes and buses. Procedures Relevant EAST-ADL information for timing analysis includes design the chains of function activations that compose a system response and subject to a deadline; the allocation of functions to nodes; the estimation of the resource demand of each function, the maximal utilization capacity of resources. Figure 5-12 shows an excerpt of the timing information annotating the design functional graph. Activation semantics is added to that functional graph through events definition and timing constraints among these events. This gives a timed partial order of execution for functions and end-to-end timing constraints, which are needed to make timing analysis. Figure 5-12.Excerpt of the timing model for the BBW EAST-ADL relevant information is then transformed in a UML/XXXXX model as shown in Figure Figure 5-13 and Figure 5-14.The XXXXX model is represented by an UML Activity, corresponding to the EAST-ADL functional graph, annotated with XXXXX stereotypes, containing timing and allocation information coming from the EAST-ADL model. Figure 5-13. BBW EAST-ADL Timing Model Transformation. Figure 5-14. BBW XXXXX model. On this XXXXX model it is now possible to launch the analysis. Various indicators for schedulability are calculated by the analysis as the node utilization Figure 5...
AutoNDA by SimpleDocs

Related to Timing Analysis with Qompass

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • MANAGEMENT OF EVALUATION OUTCOMES 12.1 The evaluation of the Employee’s performance will form the basis for rewarding outstanding performance or correcting unacceptable performance.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Program Evaluation The School District and the College will develop a plan for the evaluation of the Dual Credit program to be completed each year. The evaluation will include, but is not limited to, disaggregated attendance and retention rates, GPA of high-school-credit-only courses and college courses, satisfactory progress in college courses, state assessment results, SAT/ACT, as applicable, TSIA readiness by grade level, and adequate progress toward the college-readiness of the students in the program. The School District commits to collecting longitudinal data as specified by the College, and making data and performance outcomes available to the College upon request. HB 1638 and SACSCOC require the collection of data points to be longitudinally captured by the School District, in collaboration with the College, will include, at minimum: student enrollment, GPA, retention, persistence, completion, transfer and scholarships. School District will provide parent contact and demographic information to the College upon request for targeted marketing of degree completion or workforce development information to parents of Students. School District agrees to obtain valid FERPA releases drafted to support the supply of such data if deemed required by counsel to either School District or the College. The College conducts and reports regular and ongoing evaluations of the Dual Credit program effectiveness and uses the results for continuous improvement.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

Time is Money Join Law Insider Premium to draft better contracts faster.