TOPOGRAPHIC SURVEY & ROUTE SURVEY Sample Clauses

TOPOGRAPHIC SURVEY & ROUTE SURVEY. CrossRoad Engineers will survey the project limits in order to produce a topographic base map and Location Control Route Survey in accordance with applicable Indiana Code. Upon the completion of the field work, we will establish all section lines, right of way lines, and property lines per deeds and platted subdivisions; complete all survey line work; generate the TIN surface model and also create one-foot interval contours; and add all relative survey notes to the drawings. Included will be information such as one-foot contouring, existing street elevations, existing sanitary and storm structures, and verification of existing utilities. This survey will also include all research, office work, and field work necessary to complete the Route Survey. The City (through the developer) has provided digital survey information for most of the new alignment length of Essex Drive, which we will utilize for our design.
AutoNDA by SimpleDocs
TOPOGRAPHIC SURVEY & ROUTE SURVEY. The field survey will be conducted to a level detailed enough to provide adequate information to complete the final design plans for the project. The limits of the survey shall be as follows:  On 161st Street, limits shall generally extend from 700’ west to 700’ east of Oak Road, for a total length of 1,400 feet. The lateral limits of the survey shall extend from the centerline of 000xx Xxxxxx 75’ north and south, for a total width of 150 feet, and including some additional width as needed near the intersection.  On Oak Road, limits shall generally extend from 600’ south to 600’ north of 161st Street, for a total length of 1,200 feet. The lateral limits of the survey shall extend from the centerline of Oak Street 75’ east and west, for a total width of 150 feet, and including some additional width as needed near the intersection.  Any other area not listed above that is needed to facilitate proper design of the roundabout or associated improvements.  Horizontal control will be completed in Indiana State Plane East Grid Coordinates and referenced to North American Datum of 1983 (NAD 83) 2011.  Vertical control will be based on Bench Xxxx ""HCBR 144"" NGS, NAVD 88 DATUM. If said monument does NOT exist, then this fee will need to be modified to accommodate use of an alternate monument.  Consultant will have the existing utilities field marked, providing above ground evidence of the location of the utility. Consultant does not guarantee the accuracy of the observed, marked utilities. The utilities will be identified by Indiana 811 and located per this survey showing horizontal location only. The depth, size, or any other features will not be noted, unless provided by the utilities.  Research the last Deed / Plat of record for the current property owners.  Plot apparent property and existing rights-of-way from physical evidence observed during a field investigation.  Plot the property owner names from Tax Assessment / Government Records.  Collect general topography within the specified survey corridor, including above ground utilities, marked below-ground utilities (horizontal locations only), xxxxx, septic systems, sanitary sewer structures, storm sewer structures, and all existing topographic information, such as culverts, trees, fences, drives, ditches, pavement, shoulders, guardrail, toes of slopes, tops of banks, flow lines, edge of water, etc.  Detail all observed structures within the survey corridor, including rim elevations, invert elevatio...

Related to TOPOGRAPHIC SURVEY & ROUTE SURVEY

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Title and Survey Review The condition of the title to the Properties. Prior to the Effective Date, Seller has provided to Buyer an ALTA title report or commitment for title insurance (individually, a “Title Commitment” and collectively, the “Title Commitments”) prepared by First American Title Insurance Company (the “Title Company”) with respect to each Real Property. Buyer may request from the Title Company an updated Title Commitment, together with copies of all documents referred to therein, for any or all of the Properties. Prior to the Effective Date, Seller has provided to Buyer a copy of an existing survey of each Property, and Buyer may, at Buyer’s sole cost and expense, obtain an update of each survey (the “Surveys”). It shall be a condition to Closing that the Title Company shall be committed to issue to Buyer an ALTA extended coverage Owner’s Policy of Title Insurance for each Property, in an amount equal to the Allocated Purchase Price and insuring title to each Property is vested in Buyer, subject only to the “Permitted Exceptions” (as hereinafter defined) and including only the “Endorsements” (as hereinafter defined) (individually and collectively, the “Title Policy”). The following matters shall be deemed “Permitted Exceptions”: all matters disclosed by the Title Commitments other than (A) those matters which the Title Company has removed from the Title Commitment by written supplement and (B) those “Mandatory Cure Items” (as hereinafter defined). “Mandatory Cure Items” shall mean (1) those matters which Seller has agreed in writing to cause to be removed at or before Closing in accordance with, and subject to, Paragraph 3(c), (2) any mortgages, deeds of trust or other similar encumbrance evidencing outstanding indebtedness voluntarily created by Seller which can be satisfied by the payment of an ascertainable amount of money, and (3) any mechanic’s, materialman’s or broker’s liens filed against a Property as a result of Seller’s acts or omissions (e.g., failure to pay) which can be satisfied by the payment of an ascertainable amount of money. The “Endorsements” shall include only those endorsements which, prior to the expiration of the Due Diligence Period, the Title Company has agreed in writing to include in the applicable Title Policy or Seller has agreed in writing to cause to be included in such Title Policy;

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Title and Survey Seller shall, at Seller's sole cost and expense, obtain and deliver to Purchaser for Purchaser's review a commitment for a standard owner's policy of title insurance along with a copy of each instrument listed as an exception thereon other than Seller's debt instruments (the "Title Commitment") on the Real Property issued by the Title Company. Seller has delivered to Purchaser a copy of the Existing Survey which Purchaser shall reimburse Seller for as provided in Section 4 hereof. During the Due Diligence Period, Seller shall obtain from the Title Company at Seller's sole cost and expense a survey endorsement and, if and to the extent available, contiguity, fairway and PUD endorsements. Purchaser may elect to receive an update to the Existing Survey (the "Updated Survey") by notifying Seller of such election in writing prior to November 6, 1997. If Purchaser so elects, Seller shall, at Purchaser's sole cost and expense, obtain and deliver to Purchaser for Purchaser's review the Updated Survey. Purchaser shall have until the later of November 6, 1997 and the date which is fifteen days after receipt of the Title Commitment and Existing Survey (such date being referred to as the "Title Review Date") for examination of Title Commitment and Existing Survey and the making of any objections thereto, said objections to be made in writing and delivered to Seller on or before the end of the Title Review Date. If Purchaser shall fail to make any objections on or before the Title Review Date, Purchaser shall be deemed to have accepted all exceptions to the Title Commitment shown on Schedule B, Section II, except for exceptions 1, 2, 3 and 4, and the form and substance of the Existing Survey and all matters shown thereon; all such exceptions and matters shall be included in the term "Permitted Exceptions" as used herein. In the event Purchaser elects to receive the Updated Survey, then Purchaser shall have until the Title Review Date for examination of the Updated Survey and the making of objections to matters shown thereon, such objections to be made in writing and delivered to Seller on or before the expiration of the Title Review Date. If Purchaser shall fail to make any such objections to the Updated Survey on or before such date, Purchaser shall be deemed to have accepted the form and substance of the Updated Survey and all matters shown thereon; all such exceptions and matters shall be included as Permitted Exceptions. If any objections to (i) the Title Commitment or Existing Survey or exceptions to title are made within the Title Review Period, or (ii) the Updated Survey are made before the date specified above, then Seller shall have the right, but not the obligation except as hereafter provided, to cure (by removal, endorsement or otherwise) such objections on or before the Closing Date in a manner reasonably acceptable to Purchaser. If the objections are not cured by Seller no later than five (5) days before the scheduled Closing Date, then Purchaser may as its only option, elect to either: (i) waive such objection and consummate the transaction contemplated by this Agreement; or (ii) terminate this Agreement, in which event the Xxxxxxx Money shall be returned to Purchaser and neither party shall have any further obligations to the other party except for the Surviving Obligations. Notwithstanding anything to the contrary contained in this Agreement, Seller shall be obligated to remove (or cause the Title Company to affirmatively insure over in a manner reasonably acceptable to Purchaser) (i) any deeds of trust, mortgages, and related loan documents securing any financing obtained by Seller, including, without limitation, the existing loan with Continental Bank, N.A. (the "Existing Loan"), (ii) any mechanic's or materialmen's liens relating to work done by or on behalf of Seller and (iii) any tax or judgment liens against Seller. Seller agrees to use best efforts to satisfy all of the requirements set forth in Schedule B - Section 1 of the Commitment at or prior to the Closing Date.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Title Reports With respect to each Closing Date Mortgaged Property listed in Part B of Schedule 4.1N annexed hereto, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the Closing Date and satisfactory in form and substance to Administrative Agent;

  • Title and Survey Matters 4.1 As soon as practicable after the Closing Date, Seller shall deliver to Purchaser a standard owner's policy of title insurance issued by the Title Insurer/Escrow Agent ("TITLE POLICY"). The Title Policy shall insure marketable title to the Property in the amount of the Purchase Price, free and clear of all liens, encumbrances and exceptions whatsoever, save and except only for those easements, restrictions and other matters of record affecting title to the Property which are Permitted Exceptions (as hereinafter defined). 4.2 Purchaser shall have until the end of the Due Diligence Period (as hereinafter defined) in which to review the title commitment and as-built survey to be delivered by Seller pursuant to Section 5.1, and to obtain any modifications, endorsements or other revisions to either the title commitment or the survey required by Purchaser, at Purchaser's cost. If Purchaser is unable to obtain any modification, endorsement or other revision to the title commitment or survey required by Purchaser, or if any items remain on the title commitment or survey which are not acceptable to Purchaser ("UNPERMITTED EXCEPTIONS"), then on or before the end of the Due Diligence Period, Purchaser shall so notify Seller (an "OBJECTION NOTICE"). Seller has a period of ten (10) days after the date of the Objection Notice in which Seller, using good faith efforts, shall attempt to remove such Unpermitted Matters or remedy same in a manner satisfactory to Purchaser in its sole and absolute discretion, or have the Title Insurer/Escrow Agent commit to insure against loss or damage that may be occasioned by such exceptions (in endorsements satisfactory to Purchaser). If Seller does not cure any Unpermitted Exceptions to Purchaser's satisfaction within such period, then Purchaser may either (a) terminate this Agreement by giving written notice to Seller of such termination not later than five (5) days following the end of the ten (10) day cure period, in which event the Xxxxxxx Money, and all interest earned thereon, shall be returned to Purchaser and neither party shall have any further obligations or liabilities hereunder or (b) accept such Unpermitted Exceptions. Any item not specified in the Objection Notice or subsequently accepted by Purchaser shall be a "PERMITTED EXCEPTION". Seller shall be obligated to remove prior to Closing all mortgages and other liens or encumbrances of a definite or ascertainable monetary amount, and if Seller fails to do so, Purchaser may elect to terminate this Agreement. At the Closing, and as a further condition of Purchaser's performance of its obligations hereunder, Seller shall cause the Title Insurer/Escrow Agent to deliver to Purchaser the Title Policy or a marked-up and signed commitment to deliver same.

  • Title Insurance and Surveys Due to the critical timeline requirements to close the transaction, PHI may order title searches on all PH Owned Real Property and PH Leased Real Property to be transferred to NPC pursuant to this Agreement. These title searches will be performed by a national title company approved by PHI. If PHI has established relations with such company, NPC will be entitled to the benefit of PHI’s preferred rates. If permissible under applicable law and the terms of any agreement with such company, the fees paid for the searches may be applied toward the title policy costs for title policies desired by NPC based upon these title searches In the event NPC or NPC’s lender requires environmental reports relating to the PH Owned Real Property, NPC shall first obtain PHI’s prior written consent and shall execute the Access and Confidentiality Agreement substantially in the form attached hereto as Exhibit “E”, and shall retain a nationally recognized firm approved by PHI to perform such work. PH will not consent to any invasive environmental audit or review and the results of any permitted environmental audit or review will not affect NPC’s obligations hereunder. To the extent that NPC or NPC’s lender requires surveys of the Owned Real Property, NPC shall retain a nationally recognized firm approved by PHI to perform such work. The consultants referenced in this Section 1.7 will be retained solely by NPC, but PH shall have the right to obtain copies of any documents or reports that they prepare. As provided for in Sections 5 and 10.9, NPC shall reimburse PH at Closing (or at such other time as contemplated by those provisions) for all actual or estimated costs incurred by PH in obtaining title insurance, surveys and/or environmental reports on behalf of NPC. Notwithstanding the foregoing however, NPC will not be responsible for the payment or reimbursement of any costs relating to title insurance, surveys and/or environmental reports on any of the subject real estate unless such service is specifically requested by NPC, and request is given forty-five (45) days prior to the Closing.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!