Common use of Transmission Service Clause in Contracts

Transmission Service. 6.1 Subject to the terms of this Agreement, IID shall provide to Producer and Producer shall purchase from IID transmission service over IID's transmission system for each Plant. IID shall make arrangements with Edison to provide, at Producer's or Edison's expense, for the transfer of the electrical power to be delivered to Edison hereunder from IID's transmission system to Edison's transmission system at the Point(s) of Delivery. 6.2 The Transmission Service Entitlement for the Plants shall be the Maximum Transmission Service Entitlement for such Plants specified in Exhibit(s) II, Transmission Service, or any subsequent Plant Amendments, or such lesser amount as may be established as follows. Beginning on the Date of Initial Service for each Plant, Producer shall be entitled to specify a Transmission Service Entitlement by advance written notice given to IID's Authorized Representative at least thirty (30) days prior to the Date of Initial Service. The Transmission Service Entitlement to be provided by IID subsequent to the Date of Initial Service may be adjusted at six (6) month intervals thereafter until two (2) years after the Date of Initial Service for such Plant (the "Trial Period"). Such adjustments shall be made by having Producer's Authorized Representative give IID's Authorized Representative a ninety (90) day advance written notice as to the adjustment required. Beginning two (2) years after the Date of Initial Service for such Plant, Producer shall be entitled to specify a Transmission Service Entitlement for each successive two-year period during the remaining term of this Agreement by written notice from Producer's Authorized Representative to IID's Authorized Representative given at least ninety (90) days prior to the beginning of each two-year period. 6.3 The Transmission Service Entitlement selected by Producer for the Plants in accordance with Section 6.2 may be any amount which is less than or equal to the Maximum Transmission Service Entitlement for such Plant specified in Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments, provided, however, that the following shall apply to each Plant after the Trial Period for such Plant has elapsed. 6.3.1 If (i) the sum of the Transmission Service Entitlements for all Plants which are no longer in their Trial Periods is less than the sum of the Maximum Transmission Service Entitlements for such Plants, as shown in Exhibit(s) II, Transmission Service and in any subsequent Plant Amendments, (the "Aggregate Maximum Transmission Service Entitlement"), and (ii) provided that IID requires additional capacity for transmitting electric power to Edison's transmission system for another person (or, following the Credit Installment Period as defined in the Funding and Construction Agreement, for itself) and (iii) IID's use of such required capacity would be in conflict with Producer's right as provided herein to increase the sum of the Transmission Service Entitlements for such Plants to the Aggregate Maximum Transmission Service Entitlement, then IID shall so notify Producer in writing, specifying in such notice the portion, expressed in megawatts (MW), of the excess of the Maximum Transmission Service Entitlement over the Transmission Service Entitlement for each such Plant which it desires to use as stated above. Producer shall have ninety (90) days after receipt of IID's notice to notify IID in writing that it desires to increase the Transmission Service Entitlements of such Plants. To the extent that Producer does not elect to increase the Transmission Service Entitlement of each such Plant up to the Maximum Transmission Service Entitlement for such Plant, IID shall be entitled to use such unclaimed capacity to satisfy the transmission requirements specified in its notice to Producer, and to the extent that IID does so, Producer shall thereafter be foreclosed from increasing the Transmission Service Entitlement for such Plant in a manner which would conflict with such usage by IID. 6.3.2 IID shall treat Producer and each other person who has entered into a transmission service agreement similar in substance to this Agreement in a fair and nondiscriminatory manner in requesting additional transmission capacity as provided In this Section 6.

Appears in 2 contracts

Samples: Transmission Service Agreement (Ormat Technologies, Inc.), Transmission Service Agreement (Ormat Technologies, Inc.)

AutoNDA by SimpleDocs

Transmission Service. 6.1 Subject to the terms of this Agreement, IID shall provide to Producer Edison and Producer Edison shall purchase from IID transmission service over IID's transmission system for each Plant. IID shall make arrangements with Edison to provide, at Producer's or Edison's expense, for the transfer of the electrical power to be delivered to Edison hereunder from IID's transmission system to Edison's transmission system at the Point(sPlant(s) of Deliveryherein. 6.2 The Transmission Service Entitlement for the Plants each Plant shall be the Maximum Transmission Service Entitlement for such Plants amount either specified in Exhibit(s) In Exhibits II, Transmission ServiceIII, or IV, V, VI, VII, VIII and in any subsequent Plant AmendmentsAmendment(s), or such lesser the amount as may be established as follows. Beginning on the Date of Initial Service for each Plant, Producer shall be entitled to specify a Transmission Service Entitlement by advance written notice given provided to IID's Authorized Representative at least by Edison's Authorized Representative in a thirty (30) days 30)-day advance written notice prior to the Date of Initial Service. The Except for the Plants specified in Exhibits II, III and IV, the Transmission Service Entitlement to be provided by IID subsequent to the Date of Initial Service may be adjusted at six (6semi-annually until the Plant(s) month intervals thereafter until has/have operated for two (2) years after the Date of Initial Service for such Plant (the "Trial Period")years. Such adjustments adjustment shall be made by having ProducerEdison's Authorized Representative give IID's 'S Authorized Representative a ninety (90) day 90)-day advance written notice as to the adjustment required. Beginning two (2) years after At the Date of Initial Service end or the two-year operating period for such PlantPlant(s), Producer shall be entitled to specify a the Transmission Service Entitlement for each successive two-year period during shall remain as established or as redetermined by the remaining term of this Agreement by written notice from Producer's Authorized Representative to IID's Authorized Representative given at least ninety (90) days prior to the beginning of each two-year period. 6.3 The Transmission Service Entitlement selected by Producer Representatives and shall subsequently be fixed for the Plants in accordance with Section 6.2 may be any amount which is less than or equal to remainder of the Maximum Transmission Service Entitlement for such Plant terms specified in Exhibit[s] Exhibits II, Transmission Service III, IV, V, VI, VII, VIII and in any subsequent Plant Amendments, provided, however, that Amendment(s). The Transmission Service Entitlement shall not be changed unless otherwise agreed to by the following shall apply Authorized Representatives. 6.3 IID reserves the right to each Plant after interrupt or curtail the Trial Period for such Plant has elapsed.transmission service provided hereunder as follows: 6.3.1 If (i) the sum Operating Transmission Capability is reduced to less than normal Transmission Capacity from a Point of Receipt to a Point of Delivery, and when continuity of service within IID's Control Area is not being jeopardized, IID may curtail the transmission service currently being provided from such Point of Receipt to such Point of Delivery, to an amount "A" determined by the following formula: A = Operating Transmission Capability x Transmission Service --------------------------------- Entitlement Normal Transmission Capacity The transmission service for each Plant shall be curtailed by multiplying the Transmission Service Entitlements for all Plants which are no longer Entitlement in their Trial Periods is less than the sum of the Maximum Transmission Service Entitlements for such Plants, as shown in Exhibit(s) accordance with Exhibits II, Transmission Service III, IV, V, VI, VII, VIII and in any subsequent Plant AmendmentsAmendments by the same percentage (expressed as a decimal) as used in the determination of "A". However, any such curtailment shall occur only after IID has made all reasonable efforts to eliminate the cause of the reduction in Operating Transmission Capability, and IID shall then employ reasonable efforts to eliminate expeditiously the cause of said reduction. 6.3.2 If continuity of service within IID's Control Area is being jeopardized, as determined by IID in its sole judgment, IID may interrupt or curtail the transmission service provided hereunder to the extent necessary to avoid or eliminate such jeopardy; provided, (the "Aggregate Maximum Transmission Service Entitlement")i) that such interruptions or curtailments may be made so that IID may fully utilize all generating resources owned by it or available to it under contract in order to avoid damage to IID's electrical system caused by overloading, and (ii) provided that no such interruption or curtailment may be made by IID in order that IID requires additional capacity for transmitting electric power to may acquire all or any portion of Edison's transmission system for another person (orcapacity or energy available to Edison under contract without Edison's prior consent, following the Credit Installment Period as defined in the Funding and Construction Agreement, for itself) and (iii) that such interruption or curtailment shall occur only after IID has made all reasonable efforts to avoid or eliminate such jeopardy. 6.4 If IID's use efforts do not avoid or eliminate such jeopardy, the Parties shall endeavor to develop some other arrangements to avoid or eliminate such jeopardy and minimize the effects of such required capacity would IID's interruption or curtailment to both to Parties' Control Areas. 6.5 Subject to Section 6.8, and in the event of any curtailments or interruptions made pursuant to Section 6.3.1 or Section 6.3.2, Edison shall, immediately after being orally satisfied by IID, reduce its energy schedules by the amounts requested by IID. 6.6 The transmission service to be in conflict with Producer's right as provided herein to increase the sum of by IID and purchased by Edison for each Plant shall not exceed the Transmission Service Entitlement. 6.7 Subject to Section 6.3, IID shall, during the periods that IID has agreed to provide the transmission service at the specified Transmission Service Entitlements, accept hourly scheduled energy deliveries at the Point of Receipt and simultaneously deliver the same amount of energy to Edison or for Edison's account at the Point(s) of Delivery mutually agreed upon by the Parties' dispatchers and/or schedulers. Unless otherwise agreed to by the Authorized Representatives, the total sum of Transmission Service Entitlements for such Plants to the Aggregate Maximum Transmission Service EntitlementPoints of Delivery specified below shall not exceed 150 MV. However, then IID in no case shall so notify Producer in writing, specifying in such notice the portion, expressed in megawatts (MW), of the excess of the Maximum Transmission Service Entitlement over the Transmission Service Entitlement for each such Plant which it desires to use as stated above. Producer a specified Point of Delivery exceed the following: Blythe Substation 161 kV: 110 MV Mirage Substation 115/92 kV: 35 MW Mirage Substation 230 kV: 150 MW' Edison shall have ninety (90) days after receipt provide IID an executed copy of IID's notice to notify IID in writing that it desires to increase the Transmission Service Entitlements of such Plants. To the extent that Producer does not elect to increase the Transmission Service Entitlement of each such Plant up to the Maximum Transmission Service Entitlement for such Plant, IID shall be entitled to use such unclaimed capacity to satisfy the transmission requirements specified in its notice to Producer, and to the extent that IID does so, Producer shall thereafter be foreclosed from increasing the Transmission Service Entitlement for such Plant in a manner which would conflict with such usage by IID. 6.3.2 IID shall treat Producer and each other person who has entered into a transmission service agreement similar with Western. 6.8 Hourly scheduled energy deliveries shall be in substance accordance with the provisions of this Agreement. The hourly schedules shall conform with the practices and procedures developed by the Parties' dispatchers and schedulers and agreed to this Agreement in a fair by the Authorized Representatives. IID shall coordinate the hourly scheduled energy deliveries from the Plant(s) until such time that dynamic scheduling may be arranged and nondiscriminatory manner in requesting additional transmission capacity as provided In this Section 6procedures for such may be agreed to by the Authorized Representatives.

Appears in 2 contracts

Samples: Transmission Service Agreement (Ormat Technologies, Inc.), Transmission Service Agreement (Ormat Technologies, Inc.)

Transmission Service. 6.1 Subject to the terms of this Agreement, IID shall provide to Producer and Producer shall purchase from IID transmission service over IID's transmission system for each Plant. IID shall make arrangements with Edison to provide, at Producer's or Edison's expense, for the transfer of the electrical power to be delivered to Edison hereunder from IID's transmission system to Edison's transmission system at the Point(s) of Delivery. 6.2 The Transmission Service Entitlement for the Plants each Plant shall be the Maximum Transmission Service Entitlement for such Plants Plant specified in Exhibit(s) II, Transmission Service, or any subsequent Plant Amendments, or such lesser amount as may be established as follows. Beginning on the Date of Initial Service for each Plant, Producer shall be entitled to specify a Transmission Service Entitlement by advance written notice given to IID's Authorized Representative at least thirty (30) days prior to the Date of Initial Service. The Transmission Service Entitlement to be provided by IID subsequent to the Date of Initial Service may be adjusted at six (6) month intervals thereafter until two (2) years after the Date of Initial Service for such Plant (the "Trial Period"). Such adjustments shall be made by having Producer's Authorized Representative give IID's Authorized Representative a ninety (90) day advance written notice as to the adjustment required. Beginning two (2) years after the Date of Initial Service for such Plant, Producer shall be entitled to specify a Transmission Service Entitlement for each successive two-year period during the remaining term of this Agreement by written notice from Producer's Authorized Representative to IID's Authorized Representative given at least ninety (90) days prior to the beginning of each two-year period. 6.3 The Transmission Service Entitlement selected by Producer for the Plants each Plant in accordance with Section 6.2 may be any amount which is less than or equal to the Maximum Transmission Service Entitlement for such Plant specified in Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments, provided, however, that the following shall apply to each Plant after the Trial Period for such Plant has elapsed. 6.3.1 If (i) the sum of the Transmission Service Entitlements for all Plants which are no longer in their Trial Periods is less than the sum of the Maximum Transmission Service Entitlements for such Plants, as shown in Exhibit(s) II, Transmission Service and in any subsequent Plant Amendments, (the "Aggregate Maximum Transmission Service Entitlement"), ) and (ii) provided that IID requires additional capacity for transmitting electric power to Edison's transmission system for another person (or, following the Credit Installment Period as defined in the Funding and Construction Agreement, for itself) and (iii) IID's use of such required capacity would be in conflict with Producer's right as provided herein to increase the sum of the Transmission Service Entitlements for such Plants to the Aggregate Maximum Transmission Service Entitlement, then IID shall so notify Producer in writing, specifying in such notice the portion, expressed in megawatts (MW), of the excess of the Maximum Transmission Service Entitlement over the Transmission Service Entitlement for each such Plant which it desires to use as stated above. Producer shall have ninety (90) days after receipt of IID's notice to notify IID in writing that it desires to increase the Transmission Service Entitlements of such Plants. To the extent that Producer does not elect to increase the Transmission Service Entitlement of each such Plant up to the Maximum Transmission Service Entitlement for such Plant, IID shall be entitled to use such unclaimed capacity to satisfy the transmission requirements specified in its notice to Producer, and to the extent that IID does so, Producer shall thereafter be foreclosed from increasing the Transmission Service Entitlement for such Plant in a manner which would conflict with such usage by IID. 6.3.2 IID shall treat Producer and each other person who has entered into a transmission service agreement similar in substance to this Agreement in a fair and nondiscriminatory manner in requesting additional transmission capacity as provided In in this Section 66.3. Without limiting the generality of the foregoing, IID shall request additional transmission capacity from Producer and such other persons on a pro rata basis, in proportion to the Aggregate Maximum Transmission Service Entitlement for each person less the sum of the Transmission Service Entitlements for each of such persons' generating plants which is no longer in a Trial Period. 6.4 In the event that the Original Capacity Nomination designated by Producer (or the Participant associated with Producer) is adjusted pursuant to Section 3.07 of the Funding and Construction Agreement, the Parties agree to amend this Agreement in such a way that the sum of the Maximum Transmission Service Entitlements for all Plants hereunder is equal to such Original Capacity Nomination as so adjusted. As used in this Section 6.4, the terms Original Capacity Nomination and Participant shall have the meanings assigned to them in Article I of the Funding and Construction Agreement. 6.5 IID reserves the right to interrupt or curtail the transmission service provided hereunder as follows: 6.5.1 If the Operating Transmission Capability is reduced to less than Normal Transmission Capacity from a Point of Receipt to a Point of Delivery, and when continuity of service within IID's service area is not being jeopardized, IID may curtail the transmission service currently being provided from such Point of Receipt to such Point of Delivery, to an amount "A" determined by the following formula: A = Operating Transmission Capability x Transmission Service Entitlement --------------------------------- Normal Transmission Capacity

Appears in 2 contracts

Samples: Transmission Service Agreement (Ormat Technologies, Inc.), Transmission Service Agreement (Ormat Technologies, Inc.)

AutoNDA by SimpleDocs

Transmission Service. 6.1 Subject to the terms of this Agreement, IID shall provide to Producer and Producer shall purchase from IID transmission service over IID's transmission system for each Plant. IID shall make arrangements with Edison to provide, at Producer's or Edison's expense, for the transfer of the electrical power to be delivered to Edison hereunder from IID's transmission system to Edison's transmission system at the Point(s) of Delivery. 6.2 The Transmission Service Entitlement for the Plants each Plant shall be the Maximum Transmission Service Entitlement for such Plants Plant specified in Exhibit(s) Exhibit[s] II, Transmission Service, or any subsequent Plant Amendments, or such lesser amount as may be established as follows. Beginning on the Date of Initial Service for each Plant, Producer shall be entitled to specify a Transmission Service Entitlement by advance written notice given to IID's Authorized Representative at least thirty (30) days prior to the Date of Initial Service. The Transmission Service Entitlement to be provided by IID subsequent to the Date of Initial Service may be adjusted at six (6) month intervals thereafter until two (2) years after the Date of Initial Service for such Plant (the "Trial Period"). Such adjustments shall be made by having Producer's Authorized Representative give IID's Authorized Representative a ninety (90) day advance written notice as to the adjustment required. Beginning two (2) years after the Date of Initial Service for such Plant, Producer shall be entitled to specify a Transmission Service Entitlement for each successive two-year period during the remaining term of this Agreement by written notice from Producer's Authorized Representative to IID's Authorized Representative given at least ninety (90) days prior to the beginning of each two-year period. 6.3 The Transmission Service Entitlement selected by Producer for the Plants each Plant in accordance with Section 6.2 may be any amount which is less than or equal to the Maximum Transmission Service Entitlement for such Plant specified in Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments, provided, however, that the following shall apply to each Plant after the Trial Period for such Plant has elapsed. 6.3.1 If (i) the sum of the Transmission Service Entitlements for all Plants which are no longer in their Trial Periods is less than the sum of the Maximum Transmission Service Entitlements for such Plants, as shown in Exhibit(s) Exhibit[s] II, Transmission Service and in any subsequent Plant Amendments, (the "Aggregate Maximum Transmission Service Entitlement"), and (ii) provided that IID requires additional capacity for transmitting electric power to Edison's transmission system for another person (or, following the Credit Installment Period as defined in the Funding and Construction Agreement, for itself) and (iii) IID's use of such required capacity would be in conflict with Producer's right as provided herein to increase the sum of the Transmission Service Entitlements for such Plants to the Aggregate Maximum Transmission Service Entitlement, then IID shall so notify Producer in writing, specifying in such notice the portion, expressed in megawatts (MW), of the excess of the Maximum Transmission Service Entitlement over the Transmission Service Entitlement for each such Plant which it desires to use as stated above. Producer shall have ninety (90) days after receipt of IID's notice to notify IID in writing that it desires to increase the Transmission Service Entitlements of such Plants. To the extent that Producer does not elect to increase the Transmission Service Entitlement of each such Plant up to the Maximum Transmission Service Entitlement for such Plant, IID shall be entitled to use such unclaimed capacity to satisfy the transmission requirements specified in its notice to Producer, and to the extent that IID does so, Producer shall thereafter be foreclosed from increasing the Transmission Service Entitlement for such Plant in a manner which would conflict with such usage by IID. 6.3.2 IID shall treat Producer and each other person who has entered into a transmission service agreement similar in substance to this Agreement in a fair and nondiscriminatory manner in requesting additional transmission capacity as provided In in this Section 66.3. Without limiting the generality of the foregoing, IID shall request additional transmission capacity from Producer and such other persons on a pro rata basis, in proportion to the Aggregate Maximum Transmission Service Entitlement for each person less the sum of the Transmission Service Entitlements for each of such persons' generating plants which is no longer in a Trial Period. 6.4 In the event that the Original Capacity Nomination designated by Producer (or the Participant associated with Producer) is adjusted pursuant to Section 3.07 of the Funding and Construction Agreement, the Parties agree to amend this Agreement in such a way that the sum of the Maximum Transmission Service Entitlements for all Plants hereunder is equal to such Original Capacity Nomination as so adjusted. As used in this Section 6.4, the terms Original Capacity Nomination and Participant shall have the meanings assigned to them in Article I of the Funding and Construction Agreement. 6.5 IID reserves the right to interrupt or curtail the transmission service provided hereunder as follows: 6.5.1 If the Operating Transmission Capability is reduced to less than Normal Transmission Capacity from a Point of Receipt to a Point of Delivery, and when continuity of service within IID's service area is not being jeopardized, IID may curtail the transmission service currently being provided from such Point of Receipt to such Point of Delivery, to an amount "A" determined by the following formula: A = Operating Transmission Capability x Transmission Service --------------------------------- Entitlement Normal Transmission Capacity

Appears in 2 contracts

Samples: Transmission Service Agreement (Ormat Technologies, Inc.), Transmission Service Agreement (Ormat Technologies, Inc.)