Tree Trimming and Brush Cutting Sample Clauses

Tree Trimming and Brush Cutting. All tree trimming and brush cutting in connection with the initial placement of wires or other Equipment shall be borne entirely by the Party placing the wires or other Equipment. Unless agreed otherwise, each Party shall be responsible for any and all additional tree trimming and brush cutting related to the wires or Equipment it owns.
AutoNDA by SimpleDocs
Tree Trimming and Brush Cutting. Tree trimming and brush cutting shall be performed in accordance with the State of Oregon Occupational Safety and Health Code.

Related to Tree Trimming and Brush Cutting

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • METERING AND BILLING Metering requirements and billing procedures shall be set forth in the AEC rate schedule(s) applicable to the electric service account assigned to the location where the Generating Facility is connected.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.