Trees and Plantings Sample Clauses

Trees and Plantings. Shall be kept trimmed with dead material removed and hazardous limbs pruned. This agreement shall not be construed as restricting, prohibiting or otherwise relieving the City of the responsibility for inspection and upkeep of trees in a manner that will insure maximum safety to both vehicular and pedestrian traffic or to restrict or relieve the City from following the same policy and procedure generally followed by it with respect to streets of the City in the matter of requiring sidewalk repairs and control of vegetation to be made by or at the expense of abutting owners who are under legal obligation to perform such work.
AutoNDA by SimpleDocs

Related to Trees and Plantings

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

Time is Money Join Law Insider Premium to draft better contracts faster.