TSA Project Closeout Sample Clauses

TSA Project Closeout. Once the CBIS has passed all necessary tests, the following actions shall be taken to close out the project: • Submittal of Control Configuration Architecture Overview HCAA Project Number 5991 14 Checked Baggage Upgrades and Optimization Design Team Scope • Record Documents CBIS documentation shall be submitted to TSA, in both CAD and PDF file format, as follows: o Final Description of Operations o A complete set of BHS Record Documents mechanical and electrical drawings, including: ▪ Mechanical ▪ Cover Sheet & Index ▪ Legend ▪ Overall Plan View ▪ Overall Plan Existing (if available) ▪ Isometric (if HP provides 3D) ▪ CBRA Egress Plan ▪ ETD Egress Plan ▪ EDS Egress Plan ▪ EDS Removal Path ▪ ETD Plan View (1/2” scale if possible) ▪ CBRA Plan View (1/2” scale, if possible) ▪ Flow ChartStandard Details ▪ 1/8” scale plan views ▪ 1/4" scale elevation views ▪ Catwalk Drawings ▪ Structural attachment drawings (including load drawings) ▪ Structural Details ▪ Electrical Sheet Cover Sheet & Index Legend ▪ Manifest with power summary and belt speeds ▪ Control Device Plans 1/8” scale ▪ E-Stop Zones ▪ Control Device Details ▪ Network Architecture • Upper (Sort Controller) • Lower (PLC) o Final copy of the Programmable Logic Controller (PLC) program shall be submitted to TSA o Final copy of PLC and software disaster recovery procedures shall be submitted to TSA including software recovery application
AutoNDA by SimpleDocs

Related to TSA Project Closeout

  • Project Closeout a. Participate in final inspection to prepare punch lists for project contractor to correct and/or to complete listed items. Verify that items on punch lists have been completed successfully assist COUNTY Project Manager or designee to determine completion date and coordinate project close out.

  • Contract Closeout ‌ Prior to the contract’s expiration date, Supplier may be provided contract close out documentation and shall complete, sign and return to VITA Supply Chain Management within 30 days of receipt. This documentation may include, but not be limited to: Patent/Royalty Certificate, Tangible Property/Asset Certificate, Escrow Certificate, SWaM Subcontracting Certification of Compliance, Sales Reports/IFA Payments Completion Certificate, and Final Payment Certificate. Supplier is required to process these as requested to ensure completion of close-out administration and to maintain a positive performance reputation with the Commonwealth of Virginia. Any closeout documentation not received within 30 days of Supplier’s receipt of the Commonwealth's request will be documented in the contract file as Supplier non-compliance. Supplier’s non-compliance may affect any pending payments due the Supplier, including final payment, until the documentation is returned.

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Contract Closure Contracting Officer shall give appropriate written notice to Purchaser when Purchaser has complied with the terms of this contract. Purchaser shall be paid refunds due from Timber Sale Account un- der B4.24 and excess cooperative deposits under B4.218.

  • Project Completion Part 1 – Material Completion

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Project Close-out Termination of a research project that used controlled-access data from an NIHdesignated data repository (e.g., dbGaP) and confirmation of data destruction when the research is completed and/or discontinued. The project close-out process is completed in the dbGaP Authorized Access System.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.