TEXT MESSAGING WHILE DRIVING In accordance with Executive Order (EO) 13513, “Federal Leadership on Reducing Text Messaging While Driving,” any and all text messaging by Federal employees is banned: a) while driving a Government owned vehicle (GOV) or driving a privately owned vehicle (POV) while on official Government business; or b) using any electronic equipment supplied by the Government when driving any vehicle at any time. All cooperators, their employees, volunteers, and contractors are encouraged to adopt and enforce policies that ban text messaging when driving company owned, leased or rented vehicles, POVs or GOVs when driving while on official Government business or when performing any work for or on behalf of the Government.
Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:
Général Le Logiciel Apple peut activer l’accès à l’iTunes Store d’Apple, à l’App Store, iCloud et à d’autres services et sites web d’Apple et xx xxxxxx partie (dénommés collectivement et individuellement « Services »). Il se peut que ce Service ne soit pas disponible dans toutes les langues ou tous les pays. L’utilisation de ces Services requiert un accès Internet et peut nécessiter, pour certains d’entre eux, de posséder un identifiant Apple et d’accepter des conditions supplémentaires, voire entraîner des frais supplémentaires. En utilisant ce logiciel avec un compte iTunes Store, un identifiant Apple ou tout autre type de service Apple, vous acceptez les conditions générales de ce service, par exemple la dernière version des conditions générales des services Apple Media, disponibles à l’adresse https:// xxx.xxxxx.xxx/xxxxx/xxxxxxxx-xxxxxxxx/xxxxxx/.
Reducing Text Messaging While Driving Pursuant to Executive Order 13513, 74 FR 51225 (Oct. 6, 2009), Recipient should encourage its employees, subrecipients, and contractors to adopt and enforce policies that ban text messaging while driving, and Recipient should establish workplace safety policies to decrease accidents caused by distracted drivers.
CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.
Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.
International Shopping Goods estimated to cost less than $100,000 equivalent per contract may be procured under contracts awarded on the basis of international shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines.
Network Etiquette You are expected to abide by the generally accepted rules of network etiquette. These include but are not limited to the following:
National Shopping Goods estimated to cost less than $50,000 equivalent per contract, may be procured under contracts awarded on the basis of national shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines.
Formwork Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re- use. The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself. Formwork to soffits of solid slabs etc., shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described. Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks. Carried to Collection R Amount Item Quantity Rate Amount No REINFORCED CONCRETE 25 MPa/19mm Concrete: 14 Base slabs. m3 7 15 Suspended Slabs. m3 7 TEST BLOCKS Test blocks: 16 Making and testing set of three 150x150x150mm concrete strength test cubes (Provisional). No 4 FINISHING TOP SURFACE OF CONCRETE Finishing top surfaces of concrete with a wood float: 17 Base slabs, etc m2 36 Finishing top surfaces of concrete smooth with steel float: 18 Suspended slab, etc m2 36 ROUGH FORMWORK (DEGREE OF ACCURACY II) Rough Formwork to Sides: 19 Edges, risers, ends and reveals not exceeding 300mm high or wide. m 27 Smooth Formwork to Sides: 20 Edges, risers, ends and reveals not exceeding 300mm high or wide. m 27 Fabric reinforcement: