Uninterruptible Power Supplies Sample Clauses

Uninterruptible Power Supplies. ATN shall supply uninterruptible power supplies in order to protect the servers and networking equipment from electrical surges along with having the backup capacity to allow for graceful shutdowns of servers during the course of a power outage.
AutoNDA by SimpleDocs
Uninterruptible Power Supplies. Host will provide UPS Battery Backup Units for all Internet Servers, Routers, Switches and Support Equipment needed to maintain consistent uptime in the event of short-duration Utility Power Outages.

Related to Uninterruptible Power Supplies

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • ARRANGING FOR FIRM ALL-REQUIREMENTS POWER SUPPLY Competitive Supplier shall participate in or make appropriate arrangements with the ISO-NE, any relevant regional transmission organization, wholesale suppliers or any other entity to ensure an uninterrupted flow of reliable, safe, firm, All-Requirements Power Supply to the Local Distributor for delivery to Participating Consumers, and take Commercially Reasonable steps to cooperate with the NEPOOL, the ISO-NE or any other entity to ensure a source of back-up power in the event that the facilities owned or controlled by Competitive Supplier's affiliates or other sources of power supply are unable to generate and/or deliver All-Requirements Power Supply to the Point of Delivery. In the event the Competitive Supplier is unable to deliver sufficient electricity to the grid to serve Participating Consumers, the Competitive Supplier shall utilize such arrangements as may be necessary to continue to serve Participating Consumers under the terms of this ESA, and shall bear any costs it may incur in carrying out these obligations. Competitive Supplier shall not be responsible to the Town or any Participating Consumers in the event the Local Distributor disconnects, curtails or reduces service to Participating Consumers (notwithstanding whether such disconnection is directed by the ISO- NE) in order to facilitate construction, installation, maintenance, repair, replacement or inspection of any of the Local Distributor’s facilities, to maintain the safety and reliability of the Local Distributor’s electrical system, or due to any other reason, including emergencies, forced outages, potential overloading of the Local Distributor’s transmission and/or distribution circuits, Force Majeure or the non-payment of any distribution service costs or other such costs due for services provided by the Local Distributor to a Participating Consumer.

  • Power Supply Information 11.1.1 Monthly/Quarterly Report of Usage Monthly Report of Usage – Competitive Supplier shall provide the Town or its agent with a monthly report of usage which will contain:

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Classroom Interruptions Classroom interruptions shall be kept to a minimum. Principals shall establish schedules for the use of the intercom services in each school, including staff use. The schedule shall be posted. Deviations from the schedule shall be made only in an emergency or when other means of communication are not possible or feasible.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

Time is Money Join Law Insider Premium to draft better contracts faster.