Water Main Relocation Sample Clauses

Water Main Relocation. Water main relocation design and construction will be completed as shown in the PLANS and SPECIFICATIONS as part of the CONTRACT. There are additional water mains, not shown on the PLANS and SPECIFICATIONS, addressed in Section 8 below.
AutoNDA by SimpleDocs
Water Main Relocation. This bid item shall be paid on a unit basis per location. This bid item shall include labor, equipment and all materials necessary to install the 2” water line in accordance with Plans and Western Virginia Water Authority (WVWA) specifications. The unit price shall also include materials, excavation, backfill, and other work for complete installation.

Related to Water Main Relocation

  • WORKING FROM HOME 51.1. Subject to this clause, the Employer may consider the introduction of working from home arrangements. The introduction of working from home arrangements does not provide for the Employee’s primary place of work to be moved from the Employee’s headquarters/work base to the Employee’s home.

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Building Maintenance The host facility provider shall maintain (in a state of good repair) all buildings used for the educational program. All damages made by the AGENCY’s program will be the responsibility of the AGENCY to repair.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Common Area (Check one)

Time is Money Join Law Insider Premium to draft better contracts faster.