Wiring. An in-line use holder with fuse shall be furnished and installed in un- grounded conductor between control and lamp, and as per DWG J-5135. Contractor shall furnish and install the required number of #12 conductors or larger, between socket of fire alarm luminaire and the proper terminal on the terminal board of luminaire, or the socket of other luminaire or lamp fixtures on said bracket and attach end wires to sockets in both units.
Appears in 2 contracts
Samples: www.bidnet.com, a856-cityrecord.nyc.gov
Wiring. An in-line use holder with fuse shall be furnished and installed in un- un-grounded conductor between control and lamp, and as per DWG J-5135. Contractor shall furnish and install the required number of #12 conductors or larger, between socket of fire alarm luminaire and the proper terminal on the terminal board of luminaire, or the socket of other luminaire or lamp fixtures on said bracket and attach end wires to sockets in both units.
Appears in 2 contracts