Work Orders for Winter Maintenance Sample Clauses

Work Orders for Winter Maintenance. Either party, at its own discretion, may submit an annual Work Order for winter maintenance operations. Any such annual Work Order shall include a plan identifying the routes on which the requesting party desires winter maintenance services to be performed. Unless otherwise notified by the requesting party, the performing party will conduct winter maintenance operations on the roads and streets identified in the plan at those times the performing party has mobilized winter operations in the general area. Provided an annual Work Order request has been submitted by the requesting party and accepted by the performing party, individual Work Order requests will not be required to initiate a response to snow and ice events.
AutoNDA by SimpleDocs

Related to Work Orders for Winter Maintenance

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.

  • Routine Maintenance Services PM1.03.2-1 Respond immediately to restrict all access to Highway Crossing Infrastructure, as directed by the Province.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement.

  • Maintenance and Support Services As long as you are not using the Help Desk as a substitute for our training services on the Tyler Software, and you timely pay your maintenance and support fees, we will, consistent with our then-current Support Call Process:

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Corrective Maintenance ‌ Corrective Maintenance as referred to herein shall mean Repair and/or Replacement Services. For the purposes of evaluating whether Corrective Maintenance qualifies as either Minor or Major Corrective Maintenance, the Contractor shall calculate the total cost of the Corrective Maintenance in accordance with the following formulas, and the cost shall be calculated per Repair Item which shall be compared to the Major/Minor Corrective Maintenance Threshold listed in Table 2. Total Cost of Repair Item = (Labor Cost) + (Material Cost) Where: Labor Cost = (H) x [(1 + LMR/100) x (PWR + SB)] H = Number of labor hours needed to complete the Corrective Maintenance LMR = Labor Markup Rate (%) PWR = Prevailing Wage Rate SB = Supplemental Benefits Material Cost = (Cost of Materials) x (1 + MMR/100) Where: MMR = Materials Markup Rate (%) The Contractor’s Monthly Maintenance fee shall include, but is not necessarily limited to, all preventative maintenance service and all corrective maintenance service with a total cost (labor and materials) less than or equal to the thresholds listed in the following table, which shall be referred to as ‘Minor Corrective Maintenance: Table 2: Corrective Maintenance Thresholds Lot(s) Type of Equipment Major/Minor Corrective Maintenance Threshold 1 Gearless Traction Elevators $2500 1 Geared Traction Elevators $2500 2 Hydraulic Elevators $1000 3 Escalators $2500 4 Wheelchair Lifts $500 4 Stage Lifts $500 4 Dumbwaiters $500 Corrective maintenance work that has a Total Cost that exceeds these thresholds shall be considered Major Corrective Maintenance. The Contractor shall justify all costs for Major Corrective Maintenance to the Authorized User’s satisfaction, and for Repair Items that qualify as Major Corrective Maintenance the Contractor shall be compensated for the full cost of the work unless the corrective maintenance is determined to be the result of the Contractor’s negligence, in which case the Contract shall not be additionally compensated. Prior to performing any Major Corrective Maintenance, the Contractor shall submit a Cost Proposal to the Authorized User for approval. The Cost Proposal shall be a maximum, not to exceed price; shall include all labor and material costs associated with the Major Corrective Maintenance and shall be calculated on a per item basis (like items shall not be combined in the calculation). Upon approval, a letter authorizing the work will be issued by the Authorized User and a copy of such letter must accompany the invoice for the Major Corrective Maintenance services. Please note that if subcontractors are to be used, the requirements of Section 2.22 ‘Subcontracting of Work’ shall be met.

  • Equipment Maintenance If this Contract involves computer or telecommunications hardware or other mechanical or electrical Equipment (use of the word "Equipment" means all the foregoing) as a Deliverable, then, during the warranty period and during any period covered by annual maintenance, the Contractor will provide Equipment maintenance to keep the Equipment in or restore the Equipment to good working order. This maintenance will include preventative and remedial maintenance, installation of safety changes, and installation of engineering changes based upon the specific needs of the individual item of Equipment. This maintenance will also include the repair, replacement, or exchange deemed necessary to keep the Equipment in good working order. For purposes of this Contract, Equipment restored to good working condition means Equipment that performs in accordance with the manufacturer's published specifications. The Contractor will exert its best efforts to perform all fault isolation and problem determination attributed to the Equipment covered under this Contract. The following services are outside the scope of this Contract:

Time is Money Join Law Insider Premium to draft better contracts faster.