Examples of Cargo Capacity in a sentence
The notice shall identify Customer(s) Vessel (LNG Tanker Name, Register, Register Number, Flag, LNG Cargo Capacity, and LNG Tanker Owner/Operator/Manager or as otherwise required by the DOE) and state the date and hour of arrival at the terminal, the transaction type of the vessel (import or export), and the quantity of LNG to be received or delivered, as applicable, by Southern LNG.
Figure 6: Expert definitions of fuel economy and fuel efficiencyFuel Economy Codified as MPG Longer range, lower per mile costOther Onboard Energy Four-wheel drive, HVAC, lighting, entertainment...Weight, Size, Shape Passenger and Cargo Capacity Safety (real or perceived)Torque, Horsepower Towing, Acceleration, Top SpeedFuel EfficiencyUseful energy out of the crankshaft tounit energy inputFew of our households share the same understanding of these two basic terms.
It ensures the collection, recording, expert processing, storage and making available of information resources.
The notice shall identify Customer(s) vessel (LNG Tanker Name, Register, Register Number, Flag, LNG Cargo Capacity, and LNG Tanker Owner/Operator/Manager or as otherwise required by the DOE) and state the date and hour of arrival at the terminal, the transaction type of the vessel (import or export), and the quantity of LNG to be received or delivered, as applicable, by Southern LNG.
The notice shall identify Customer(s) vessel (LNG Tanker Name, Register, Register Number, Flag, LNG Cargo Capacity, and LNG Tanker Owner/Operator/Manager or as otherwise required by the DOE) and state the date and hour of arrival at the terminal, the transaction type of the vessel (import or export), and the quantity of LNG to be received or delivered, as applicable, for Customer.
The Minimum Assured Revenue is based on the current schedule of operation from (Location to Destination) and the Cargo tonnage and rate as per the SBD/Tonnage as given below: (Estimated Annual Available Cargo Capacity and current rate per Kg. in EURO/USD/INR) *Rate above is all in rate for +1000.
This would make TIFIA loans highly applicable to Strategy Package #2 Maximize Texas’s Cargo Capacity and Strategy Package #5 Strategic Positioning for Economic Growth, which include many costly highway and rail improvements around ports.
These will not be included in the assured Revenue/Business.2. The applicant has to carry his due diligence The Capacity & rates are indicative only and may vary on various operational issues.3. The applicant has to satisfy himself about the Cargo Capacity at DAC and beyond CCU, it would be subject load.4. If any time the GSA demands lower rates due to any reasons, it will have no bearing on the MGR.
Dimensions: Overall length: 217.0 m Length between P.P.: 200.2 m Breadth moulded: 32.2 m Depth moulded to uppermost deck: 19.4 m Design draft: 11.0 m Cargo Capacity: The VESSEL's deadweight shall be 29,400 metric tonnes, corresponding to a mean draft in seawater (specific gravity 1.025 metric tons/m3) of 11.0 m (hereinafter the "guaranteed deadweight).
Capacity reductions in winter schedule of 5 short-haul and 3 long-haul aircraft.Volume(RPK) above capacity growth Load Factor(SLF) Cargo Capacity Operating profit expected at around 1 billion Euros SegmentResult 2013(m EUR) *incl.