Completed Performance Test definition

Completed Performance Test means, with respect to the Facility, any Performance Test established as a Completed Performance Test in accordance with the provisions of Section 6.2.7 hereof.
Completed Performance Test has the meaning set forth in Section 7.3.2.
Completed Performance Test means the completion of a Performance Test in its entirety under the following conditions: (i) without the use of any auxiliary, standby or temporary equipment or machinery, and (ii) while the Facility is operated in its normal mode of operation, which shall consist of (x) the operation of the Facility as a whole, (y) the concurrent operation of Facility systems, and (z) the operation of all Facility systems within the manufacturers’ specifications, and without over-stressing, over-firing or over-pressurizing any such systems.

Examples of Completed Performance Test in a sentence

  • During such Completed Performance Test, if Contractor shall reasonably determine that it is necessary to reduce electrical output or increase heat rate of the Facility to achieve the Guaranteed Emissions Limits, Contractor may do so provided Contractor pays to Owner the amounts required to be paid in accordance with Sections 8.2.2.1 and 8.2.3.1.

  • Contractor guarantees to Owner that, for the duration of the Completed Performance Test used to determine the level of achievement of the Performance Guarantees at Project Completion, the Facility shall not exceed the Guaranteed Emissions Limits (Natural Gas).

  • The Notice of Provisional Performance Acceptance shall contain a report of results of the Completed Performance Test in a form acceptable to Owner and with sufficient detail to enable Owner to determine whether Provisional Performance Acceptance has been achieved.

  • Payment for completed goods delivered to and accepted by WAM shall be at the Contract price.

  • Contractor guarantees that the Facility will be capable of achieving all the performance specifications referred to in this Section 8.2 and Appendix M (the “Performance Guarantees”) during a Completed Performance Test.

  • Contractor guarantees that the Net Electrical Output during the Completed Performance Test used to determine achievement of Final Performance Acceptance of the Facility following Phase 3 completion operated at Maximum Continuous Rating (MCR), combustion turbines operating in accordance with Acceptance Test Guidelines in Appendix M shall not be less than 69.1 MWe, when corrected to ambient conditions recorded during the test (the “Electrical Output Guarantee”).

  • Owner shall, promptly upon receipt of the Notice of Provisional Performance Acceptance, inspect the Facility and all Works completed by Contractor and review the results of the Completed Performance Test and report submitted by Contractor.

  • These countries should reassess their reasoning for these prudential requirements and consider the costs associated with this practice, not only to the regulator but to the institution being regulated as well.


More Definitions of Completed Performance Test

Completed Performance Test means the completion of a Performance Test in its entirety under the following conditions: (i) without the use of any auxiliary, standby or temporary equipment or machinery, and (ii) while the Facility is operated in its normal mode of operation, which shall consist of (x) the operation of the Facility as a whole, (y) the concurrent operation of Facility systems, and (z) the operation of all Facility systems within the manufacturers’ specifications, and without over-stressing, over-firing or over- pressurizing any such systems.
Completed Performance Test means any Performance Test conducted in accordance with the provisions of Section 7.2.2 during which all or portions of the Work and the operation thereof are to be demonstrated by the Turnkey Contractor to operate at specified standards or rates and, while so doing, to comply with Applicable Laws and, once the standards or rates for such test are successfully accomplished, constituting a Completed Performance Test in accordance with the provisions of Section 7.3.
Completed Performance Test means the completion of a Performance Test in its entirety under the following conditions:

Related to Completed Performance Test

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.

  • Energy Performance Score means the numeric rating generated by Portfolio Manager that compares the Energy usage of the building to that of similar buildings.

  • Total Performance means that the entire Work, except those items arising from the provisions of any warranty, have been performed in accordance with the Contract;

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Basket Performance means a decimal number calculated by applying the following formula: BP = ∑ W ×iX ⎛⎜⎜i=1 ⎝ Underlyingi,FINAL ⎞⎟⎠Underlyingi,INITIAL ⎟ where: BP = Basket Performance X = 8 Wi = Weighting of the relevant Underlying Underlying i,FINAL Underlying i,INITIAL= Arithmetic mean of the Reference Prices of the relevant Underlying with respect to all Averaging Dates = Initial Price of the relevant Underlying

  • energy performance contracting means a contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings;

  • Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.

  • Underlying Performance means in relation to the Valuation Date a decimal number calculated by applying the following formula: UP =Underlying FINAL Underlying INITIAL where: UP = Underlying Performance with respect to the Valuation Date UnderlyingFINAL UnderlyingINITIAL= Reference Price of the Underlying with respect to the Valuation Date = Initial Price of the Underlying

  • performance requirement means a requirement that:

  • Environmental Performance means all or any of the following: the consumption of energy and associated generation of greenhouse gas emissions; the consumption of water; waste generation and management; and any other environmental impact arising from the use or operation of the Premises or the Estate;

  • Qualifying Performance Criteria means any one or more of the following performance criteria, either individually, alternatively or in any combination, applied to either the Company as a whole or to a business unit, Parent, Subsidiary or business segment, either individually, alternatively or in any combination, and measured either annually or cumulatively over a period of years, on an absolute basis or relative to a pre-established target, to previous years’ results or to a designated comparison group, and on a pre-tax or after-tax basis, in each case as specified by the Committee in the Award: (i) cash flow (including operating cash flow or free cash flow); (ii) earnings (including gross margin, earnings before interest and taxes, earnings before taxes, and net earnings); (iii) earnings per share; (iv) growth in earnings or earnings per share; (v) stock price; (vi) return on equity or average stockholders’ equity; (vii) total stockholder return; (viii) return on capital; (ix) return on assets or net assets; (x) return on investment; (xi) revenue; (xii) income or net income; (xiii) operating income or net operating income; (xiv) operating profit or net operating profit; (xv) operating margin; (xvi) return on operating revenue; (xvii) market share; (xviii) contract awards or backlog; (xix) overhead or other expense reduction; (xx) growth in stockholder value relative to the moving average of the S&P 500 Index or a peer group index; (xxi) credit rating; (xxii) strategic plan development and implementation (including individual performance objectives that relate to achievement of the Company’s or any business unit’s strategic plan); (xxiii) improvement in workforce diversity; (xxiv) expenses; (xxv) economic value added; (xxvi) product quality; (xxvii) number of customers; (xxviii) objective customer indicators; (xxix) customer satisfaction; (xxx) new product invention or innovation; (xxxi) profit after taxes; (xxxii) pre-tax profit; (xxxiii) working capital; (xxxiv) sales; (xxxv) advancement of the Company’s product pipeline; (xxxvi) consummation of strategic transactions; (xxxvii) reduction in cash utilization; and (xxxviii) addition of technologies and products. The Committee may appropriately adjust any evaluation of performance under a Qualifying Performance Criteria to exclude any of the following events that occurs during a performance period: (A) asset write-downs; (B) litigation or claim judgments or settlements; (C) the effect of changes in tax law, accounting principles or other such laws or provisions affecting reported results; (D) accruals for reorganization and restructuring programs; and (E) any gains or losses classified as extraordinary or as discontinued operations in the Company’s financial statements.

  • Performance Milestone means an act or event specified in section 5.1 and described in section 9 of the EPLA.

  • Subprojects means more than one such Subproject.

  • Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Control Performance Standard or “CPS” shall mean the reliability standard that sets the limits of a Balancing Authority’s Area Control Error over a specified time period.

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • Substantial Performance means the stage of completion when:(a) all Work, as certified by the Contract Administrator, is capable of completion or correction at a cost of not more than:

  • Energy savings performance contract means a public contract between a contracting agency and a qualified energy service company for the identification, evaluation, recommendation, design and construction of energy conservation measures, including a design-build contract, that guarantee energy savings or performance.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Project Milestones means the project milestones set forth in Schedule-G;

  • proof of B-BBEE status level of contributor means:B-BBEE Status level certificate issued by an authorized body or person;A sworn affidavit as prescribed by the B-BBEE Codes of Good Practice;Any other requirement prescribed in terms of the B-BBEE Act;