Examples of CVA Metering System in a sentence
Where BSCCo becomes aware of any maters which would or might reasonably be expected to give rise to a Trading Dispute, then it shall notify the CfD Counterparty and the CM Settlement Body of: • The MSID relating to the applicable SVA or CVA Metering System (if known); and • The nature of the non-compliance.
With certain CVA Metering System Outstations a seal(s) has to be broken in order to access the Outstation’s local interrogation port to download metered data.
Approved Modification Proposal P190 ‘Removal of the obligation on the CDVA to provide witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems’ removed the obligation on the CDCA to break seals, witness ‘before’ and ‘after’ Meter readings and reseal Metering Equipment after work (routine or faults) was carried out on any CVA Metering System by the CVA Meter Operator Agent (MOA).
Proving Testmeanswith respect to a CVA Metering System, a Proving Test will confirm that the stored metered data associated with the energy imported to, or exported from the Total System (including System Connection Points), or alternatively provided by supply injection, and derived from a fully commissioned and BSC compliant Metering System at a Site, can be satisfactorily transferred via a suitable communications link to, and correctly recorded by, theCentral Data Collection Agent systems.
See table 09 SectionD – Charging * Table 09Charging*– £500 Application Fee– Membership fee of £250 per month– CVA Metering System Monthly Charge of £50 per month.
The MOA shall ensure that the Import or Export of electrical energy by every CVA Metering System for which it is responsible is accurately recorded by Metering Equipment installed and maintained in compliance with the relevant Code of Practice (subject to any Metering Dispensations which may be in place).
BSCCo shall provide: The MSID relating to the applicable SVA or CVA Metering System; and The nature of the non-compliance.
Enable new connections where the same Metering Equipment at an Exemptable Generating Plant is comprised in both an SVA Metering System and a CVA Metering System, where Export Active Energy is traded in CVA and Import Active Energy is traded in SVA.
As part of the 2019/20 audit scope, the TAA has continued the process of auditing all circuits associated with CVA Metering System Identifiers (MSIDs).
BSCCo shall provide:• The MSID relating to the applicable SVA or CVA Metering System; and• The nature of the non-compliance.