Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.
Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.
Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.
Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).
Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.
Letter of Acceptance (LOA) means the written notice issued by JMRC to the selected bidder(s) intimating the acceptance of selected bidder's Proposal for the award of Lease;
Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;
Conditional Acceptance means a conditional acceptance by the Liquidity Provider of an extension of the Scheduled Termination Date.
Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2
XXXX Acceptance Form means the “Acceptance Form for End User License Agreement (for SAP On Premise indirect sales)” which will be provided by SAP on a deal by deal basis.
Letter of Acceptance means the letter of formal acceptance, signed by the contractor. Procuring Entity, including any annexed memoranda comprising agreements between and signed by both Parties.
Acceptance Letter means the letter from Adviser to BD pursuant to which the Adviser appoints BD as a Broker Dealer for each series of MuniPreferred issued by any Fund that has executed a Request Letter.
Notice of Acceptance means the written notification and any accompanying documentation sent to the Consultant by the Principal advising acceptance of its Tender to provide the Services under the Contract.
Design-Build Firm means a partnership, corporation or other legal entity that:
Design-build team means an entity that consists of:
Design-bid-build means a project delivery method in which:
Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.
Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;
Design-build contract means a single contract with a Design-Build Firm for the design and construction of a public construction project.
Date of Acceptance means the date, which appears on the Notice of Acceptance and if no date appears is the date on which the Principal sent the Notice of Acceptance accepting the Contractor’s Tender.
Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.
Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.
Confirmation of Acceptance shall have the meaning specified in paragraph 2B(5).
Letter of Acceptance of Tender means letter giving intimation to the tenderer that his tender has been accepted in accordance with the provisions contained in that letter.
Design Manual means the MOHLTC design manual or manuals in effect and applicable to the development, upgrade, retrofit, renovation or redevelopment of the Home or Beds subject to this Agreement.
Acceptance of Bid means the letter/fax or any memorandum communicating to the Bidder the acceptance of its Bid and includes an advance acceptance of his Bid.