Design Construction Drawings definition

Design Construction Drawings means the drawing/s showing what is to be built signed by a Registered Professional Engineer Queensland.
Design Construction Drawings means the final proposed design suitable for construction purposes signed by a Registered Professional Engineer Queensland, including DGPS coordinates and technical specifications of all components.

Examples of Design Construction Drawings in a sentence

  • Should a conflict exist between the approved Design, Construction Drawings or Plans and any standard specifications or details referenced herein, the District shall determine which shall prevail.

  • Within twenty (20) business days after receipt of the Base Building Design Construction Drawings from Landlord, Tenant shall submit in writing to Landlord a list (“Tenant’s CD Exception List”) of design elements which Tenant reasonably deems a Material Building Change to the Approved Base Building Design Development Plans and Specifications, and whether or not Tenant consents to such claimed Material Building Change.

  • The Pile Designer shall review the construction documentation for conformance with the Pile Design, Construction Drawings and Specification and shall provide a Construction Review Producer Statement (PS-4).

  • Tenants designated to install INDIVIDUAL Heating, Ventilating and Air Conditioning SystemsTenant WorkTenant, at its sole cost and expense, shall prepare Design, Construction Drawings and Specifications for its specific Heating, Ventilating, and Air Conditioning (H.V.A.C.) system including, but not limited to, air moving equipment, air distribution exhaust ductwork and controls; as well as all required structural supports, piping, plumbing, and electrical work related thereto.

  • The Owner shall: - provide Institute with relevant information necessary to prepare and complete the Preliminary Design, Construction Drawings and relevant government approvals.

  • Documentation will include the Basis of Design, Construction Drawings, and Specifications identifying reused materials and their intended uses/locations within The Project.4.2 Waste Reduction Worksheet Source: Removing Market Barriers to Green Development.

  • The Islamic Republic of Pakistan has received a loan as of Project Design Advance (PDA) from the Asian Development Bank (ADB) for financing the cost of preparing Detailed Engineering Design, Construction Drawings and Bidding Documents for Pehur High Level Canal Extension Project (PHLCEP).

  • Each professional service work package will incorporate a Study Phase, Conceptual Design, Construction Drawings and Bidding/Construction phase.Advance Design Consultants, Inc.

  • Deliverables:• Project Manual (Final Design Construction Drawings and Specifications)• Final Design OPC Subtask 1.3: Bid AdministrationDescription: Consultant will support project bidding in accordance with Iowa State bidding laws.

  • The Contractor’s work is to be carried out in three stages as listed below:4.01 STAGE 1 : Concept Design Development / Preliminary Design and Final Design, Construction Drawings & Documents4.02 STAGE 2.

Related to Design Construction Drawings

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction Work means any work in connection with⎯

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Shop Drawings means drawings, submitted to the PHA by the Contractor, subcontractor, or any lower tier subcontractor, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract. The PHA may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Working Drawings means the final working drawings approved by Landlord, as amended from time to time by any approved changes thereto, and “Work” means all improvements to be constructed in accordance with and as indicated on the Working Drawings, together with any work required by governmental authorities to be made to other areas of the Building as a result of the improvements indicated by the Working Drawings. Landlord’s approval of the Working Drawings shall not be a representation or warranty of Landlord that such drawings are adequate for any use or comply with any Law, but shall merely be the consent of Landlord thereto. Tenant shall, at Landlord’s request, sign the Working Drawings to evidence its review and approval thereof. After the Working Drawings have been approved, Tenant shall cause the Work to be performed in accordance with the Working Drawings.

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Original construction ’ shall mean the first or initial construction

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).