Final site stabilization definition

Final site stabilization or (“stabilization”) means that all land disturbing construction activities at the construction site have been completed and that a uniform perennial vegetative cover has been established with a density of at least 70 percent of the cover for the unpaved areas and areas not covered by permanent structures or that employ equivalent permanent stabilization measures or otherwise determined acceptable by the Administering Authority where the risk of further soil erosion is minimal. (See also definition of “Stabilized”)
Final site stabilization means that A) all soil disturbing activities at the site have been completed and either 1) a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of 70% of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or 2) equivalent final stabilization measures (such as the use of gravel, riprap, gabions, or geotextiles) have been employed as determined by the Department of Public Works; B) when background native vegetation will cover less than 100% of the ground (e.g., arid areas, beaches), the 70% coverage criteria is adjusted as follows: if the native vegetation covers 50% of the ground, 70% of 50% (0.70 X 0.50 = 0.35) would require 35% total cover for final stabilization. On a beach with no natural vegetation, no stabilization is required; C) for individual lots in residential construction, final stabilization means that either 1) the homebuilder has completed final stabilization as specified above, or 2) the homebuilder has established temporary stabilization including perimeter controls for an individual lot prior to occupation of the home by the homeowner and informing the homeowner of the need for, and benefits of, final stabilization. For construction projects on land used for agricultural purposes (e.g., pipelines across crop or range land, staging areas for highway construction, etc.), final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent towaters of the United States,” and areas which are not being returned to their preconstruction agricultural use must meet the final stabilization criteria A) or B) above.
Final site stabilization means that all land dis- turbing construction activities at the construction site have been completed and that a uniform, perennial, vegetative cover has been established, with a density of at least 70% of the cover, for the unpaved areas and areas not covered by per- manent structures, or employment of equivalent permanent stabilization measures.

Examples of Final site stabilization in a sentence

  • Final site stabilization, testing, and commissioning are expected to be completed in the late Fall of 2021.

  • Final site stabilization is achieved when all soil- disturbing activities have been completed and a uniform, perennial vegetative cover with a density of 80 percent has been established or equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on all unpaved areas and areas not covered by permanent structures.

  • Runoff on 30th Ave SE drains away from the site and in the southeast direction according to the surveyed topography.Description of final stabilization (example: extent of revegetation, paving, landscaping): Final site stabilization will include the construction of hardscape (asphalt/concrete paving) and concrete sidewalks.

  • Additionally, notes must be included relatedto: Daily inspection of roadways and sweeping asnecessary Dewatering measures (if applicable) Temporary site stabilization requirements Final site stabilization requirements Winter site stabilization (for disturbance after November1) Inspection requirementsAppendix F.

  • Final site stabilization, testing, and commissioning is expected be completed by late 2019.

  • Final site stabilization, testing, and commissioning is expected to be complete in the fourth quarter of 2020.

  • Final site stabilization, testing, and commissioning are expected to be completed in the spring of 2019.

  • Final site stabilization, testing and commissioning are expected to be completed in the late fall of 2022.

  • Final site stabilization, testing, and commissioning are expected to be completed in the late Fall of 2019.

  • Final site stabilization, testing, and commissioning are expected to be completed in the late fall of 2022.

Related to Final site stabilization

  • Final Stabilization means that all soil disturbing activities at the site have been complete, and that a uniform perennial vegetative cover with a density of 70% of the cover for unpaved areas and areas not covered by permanent structures has been established or equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed.

  • Stabilization means providing adequate measures, vegetative and/or structural, that will prevent erosion from occurring.

  • Mobilization means establishment of sufficiently adequate infrastructure by the CONTRACTOR at "SITE" comprising of construction equipments, aids, tools tackles including setting of site offices with facilities such as power, water, communication etc. establishing manpower organisation comprising of Resident Engineers, Supervising personnel and an adequate strength of skilled, semi-skilled and un-skilled workers, who with the so established infrastructure shall be in a position to commence execution of work at site(s), in accordance with the agreed Time Schedule of Completion of Work. "MOBILISATION" shall be considered to have been achieved, if the CONTRACTOR is able to establish infrastructure as per Time Schedule, where so warranted in accordance with agreed schedule of work implementation to the satisfaction of ENGINEER-IN-CHARGE/ EMPLOYER.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Floodplain Management means the operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works and floodplain management regulations.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Drug-free workplace means a site for the performance of work done in connection with a specific contract at which the employees of the Contractor are prohibited from engaging in the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance.

  • Floodplain Management Regulations means this ordinance and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances, and other applications of police power. This term describes federal, state or local regulations, in any combination thereof, which provide standards for preventing and reducing flood loss and damage.

  • Site Visit means a visit to the Site; and