Fire Test Procedures Code definition

Fire Test Procedures Code means the IMO Code for Application of Fire Test Procedures;
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures as adopted by the Maritime Safety Committee of the Organization by resolution MSC.61(67), as may be amended by the Organization, provided that such amendments are adopted, brought into force and take effect in accordance with the provisions of article VIII of the present Convention concerning the amendment procedures applicable to the annex other than chapter I thereof.
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures as defined in chapter II-2 of the 1974 SOLAS Convention, as amended.

Examples of Fire Test Procedures Code in a sentence

  • The test methods shall be in accordance with the Fire Test Procedures Code.

  • For fire protection items, the USCG approves “SOLAS” materials using the IMO Fire Test Procedures Code and the IMO Fire Safety Systems Code.

  • In new vessels this should be determined in accordance with the Fire Test Procedures Code.

  • Likewise for fire protection items, the USCG approves “SOLAS” materials using the IMO Fire Test Procedures Code and the IMO Fire Safety Systems Code.

  • A non-combustibility test according to ISO 1182:2010 is to be carried out as required by the Fire Test Procedures Code defined in Regulation 3 of SOLAS Chapter II-2 as amended by IMO resolutions up to MSC.421(98).

  • Any other material is a combustible material..1.a FOR CLASS B, C AND D SHIPS CONSTRUCTED ON OR AFTER 1 JANUARY 2003:Non-combustible material is a material which neither burns nor gives off flammable vapours in sufficient quantity for self-ignition when heated to approximately 750 °C, this being determined in accordance with the Fire Test Procedures Code.

  • For ships which are constructed on or after 1 January 2003, where ‘A’ class divisions are penetrated, such penetrations shall be tested in accordance with the Fire Test Procedures Code, to ensure that the fire resistance of the divisions is not impaired.

  • For ships, which are constructed on or after 1 January 2003, where ‘A’ class divisions are penetrated, such penetrations shall be tested in accordance with the Fire Test Procedures Code, to ensure that the fire resistance of the divisions is not impaired.

  • Any other material is a combustible material..1.a FOR B, C AND D SHIPS, CONSTRUCTED ON OR AFTER 1 JANUARY 2003:Non-combustible material is a material which neither burns nor gives off flammable vapours in sufficient quantity for self-ignition when heated to approximately 750 ºC, this being determined in accordance with the Fire Test Procedures Code.

  • Jointing materials should not be rendered ineffective by heat.5.1.1.12 Plastic piping may be used for services other than those specified in 5.1.1.11 provided that appropriate fire testing, in accordance with the requirements of the Fire Test Procedures Code, has been carried out to the satisfaction of the Certifying Authority.


More Definitions of Fire Test Procedures Code

Fire Test Procedures Code means the International Code for Application of Fire Test
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures adopted by the Maritime Safety Committee of IMO by resolution MSC.61(67), as may be amended by IMO.
Fire Test Procedures Code means the
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures as adopted by the Maritime Safety Committee of the IMO by resolution
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures as adopted by the Maritime Safety Committee of the IMO by resolution MSC.61(67), as may be amended by the IMO, provided that such amendments are adopted, brought into force and take effect in accordance with the
Fire Test Procedures Code means the International Code for Application of Fire Test Procedures, 2010 (2010 FTP Code), as defined in chapter II-2 of the Convention.

Related to Fire Test Procedures Code

  • Liquidation Process Regulations means, the Insolvency and Bankruptcy Board of India (Liquidation Process) Regulations 2016 as amended from time to time;

  • Access Codes means the unique codes which the Client will determine to enable his/her access to the trading platform of the Company and/or to his/her Trading Account through the Company’s electronic systems.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Auction Procedures means the auction procedures constituting Part II of the form of Statement as of the filing thereof.

  • Complaints Procedure means the School's procedure for handling complaints from parents, as amended from time to time for legal or other substantive reasons, or in order to assist the proper administration of the School. It does not form part of the contract between you and the School. A copy of the most up-to-date procedure is on the School's website and is otherwise available from the School at any time upon request;

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Social Engineering Security Procedures means security procedures intended to prevent Social Engineering Fraud as set forth in the Application and/or as otherwise provided in writing to the Underwriter.

  • Fraud Monitoring System means an off-line administration system that monitors suspected occurrences of ABT- related fraud.