Forced Outage Replacement RECs definition

Forced Outage Replacement RECs means any combination of RECs and SRECs such that one-sixth (1/6) of an SREC equates to one REC, providing that at least 90% of the RECs shall be SRECs.
Forced Outage Replacement RECs has the meaning given in the Tariff.

Examples of Forced Outage Replacement RECs in a sentence

  • For purposes of this section, it is “commercially reasonable” not to acquire Forced Outage Replacement RECs if they are not available in sufficient quantities or if the acquisition price would exceed $45 per Forced Outage Replacement REC.

  • Such Forced Outage Replacement RECs shall be retired at QFCP Generator’s own expense without payment or reimbursement for the acquisition thereof from any source.

  • Following 90 days after the initiation of the Forced Outage Event, QFCP Generator shall be entitled to 70% of the disbursements per MWH of reduction in output to which the QFCP Generator would have been entitled but for the Forced Outage Event in the event that QFCP Generator has provided the Company with certification, pursuant to the PJM GATTS system or successor system, that it has acquired and retired Forced Outage Replacement RECs as set forth in Section K.

  • For all output for which QFCP Generator, despite using commercially reasonable efforts, is unable to acquire and retire Forced Outage Replacement RECs as set forth in Sections K (5) a and b above during a Forced Outage Event (hereinafter a “Replacement REC Shortfall”), the Company shall collect from its customers and disburse to the QFCP Generator 55% of the disbursements per MWH of reduction in output to which the QFCP Generator would have been entitled but for the Forced Outage Event.

  • For all output for which QFCP Generator, despite using commercially reasonable efforts, is unable to acquire and retire Forced Outage Replacement RECs as set forth in Sections K (5) a and b above during a Forced Outage Event (hereinafter a “Replacement REC Shortfall”), the Company shall collect from its customers and disburse to the QFCP Generator 55% of the disbursements per MWH of reduction in output to which the QFCP Generator would have been entitled but for the Forced Outage Event.P.S.C. Del.

Related to Forced Outage Replacement RECs

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Unscheduled Outage means any outage that is not a “Scheduled Outage”. “Committed Time” shall mean, as to each Business Day, one hour before the trading session for that day is scheduled to open on the NYSE and one hour after the trading session on the NYSE for that day finally closes, but excluding the following periods of Scheduled Outage (defined below). A “Scheduled Outage” shall mean (1) those time periods from 12 AM Saturday to 6:00 AM Sunday each week and 11:00 PM to 12:00 AM daily, during which Computershare’s System maybe unavailable due to routine maintenance; and (2) any time period as to which Company has received prior notice. ≥99.5% <99.5% to ≥98% <98%

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Rated Voltage means the manufacturer’s design voltage at which the transmission system is designed to operate or such lower voltage at which the line is charged, for the time being, in consultation with Transmission System Users;

  • Notice to Proceed (NTP) means the authorization issued by the CO to start performance on this Contract.

  • Excluded Downtime has the meaning set forth in Section 2 below.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • wind turbine generator or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation;

  • Force Majeure Period has the meaning specified in Section 13.1.

  • Compression Ignition Engine means an internal combustion engine with operating characteristics significantly similar to the theoretical diesel combustion cycle. The regulation of power by controlling fuel supply in lieu of a throttle is indicative of a compression ignition engine.

  • Unscheduled Downtime means any time when any or all of the applications and Services provided by the Supplier to the Customer shall be unavailable to the Customer due to unexpected system failures other than Scheduled Downtime or the downtime is attributable to events not under the control of the Supplier.

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.