Examples of Import facility in a sentence
Import facility A database shall provide a facility that allows the import of formatted data that can be used to fill the database instead of manual input.
The file Edmp.mde may grow in size due to frequent use of the Import facility.
The route takes off from the IOCL Import facility runs in a direction slightly north of east along the NH for nearly 5 kms and then turns northwards all along the NH.
The gas day is that applicable under the pipeline contract or market rules.Yesdatetime2018-09-23Capacity TypeCapacityTypeCapacity type may be:Storage: Holding capacity in storage for a BB Storage or LNG Import facility, orMDQ: Daily maximum firm capacity under the expected operating conditions.Yesvarchar( 20)STORAGE;MD QOutlook QuantityOutlookQuantityCapacity Outlook quantity in TJ to three decimal places.
Pumping Parameters• Booster pumps at IOCL Import facility despatch terminal with a maximum discharge pressure of 33 kg/cm2 (g).• Booster pumps at BPCL’s Kochi Refinery despatch terminal with a outlet pressure of 18 kg/cm2 (g).• Mainline pumps at BPCL’s Kochi Refinery despatch terminal with a maximum outlet pressure of 98 kg/cm2 (g) (900#).CC.
Import facility means, with respect to any imported liquid product, the storage tank in which the product was first delivered from outside Oregon into Oregon, including, in the case of liquid product imported by cargo tank and delivered directly to a facility for dispensing the product into motor vehicles, the cargo tank in which the product was imported.
The author herself was part of a retreat at Mahakala Center in July 2022 and was on-site during the fundraising Ukrainian women retreat in April 2023.
The system also considers combined supply of LPG from IOCL Import facility and also from Kochi Refinery to maintain the maximum flow of 1.28 MMTPA.• The 39 km pipeline from IOCL import terminal to Kochi Refinery terminal to be extended by another 11 km to connect with and meet the LPG demand of IOCL’s bottling plant located at Udayamperoor.• Total length of the main pipeline from IOCL Import facility to IOCL’s bottling plant at Salem is 447 km (incl.
Soon after the effectiveness of the project, the appropriate documentation was provided and a total of US$1,000,000 was disbursed to the Government of the Commonwealth of Dominica to finance low-sulphur diesel fuel under the Critical Import facility.
User will have to upload csv file using Import facility available under Utilities Menu.