Initial project conservation facilities definition

Initial project conservation facilities means the following project facilities specified in Section 12934(d) of the Water Code:
Initial project conservation facilities means the following project facilities specified in Section 12934(d) of the Water Code:‌ (1) All those facilities specified in subparagraph (1) thereof. (2) Those facilities specified in subparagraph (3) thereof to the extent that they serve the purposes of water conservation in the Delta, water supply in the Delta, and transfer of water across the Delta. (3) A reservoir near Los Banos in Merced County as specified in subparagraph (2) thereof. (4) The reach of the San Xxxxxxx Valley-Southern California Aqueduct extending from the Delta to a reservoir near Los Banos in Merced County, to the extent required for water conservation through conveyance of water diverted from the Delta to offstream storage in said reservoir as determined by the State. 1 Amended: Amendment No. 15 (5) Those facilities specified in subparagraph (5) thereof which are incidental to the facilities included under (1), (2), (3), and (4) above. (6) Those facilities specified in subparagraph (7) thereof which are necessary and appurtenant to the facilities included under (1), (2), (3), (4), and (5) above.
Initial project conservation facilities means the following Project Facilities specified in Section 12934(d) of the Water Code:

More Definitions of Initial project conservation facilities

Initial project conservation facilities means the following project facilities specified in Section 12934(d) of the Water Code:‌ (1) All those facilities specified in subparagraph (1) thereof. (2) Those facilities specified in subparagraph (3) thereof to the extent that they serve the purposes of water conservation in the Delta, water supply in the Delta, and transfer of water across the Delta. (3) A reservoir near Los Banos in Merced County as specified in subparagraph (2) thereof. (4) The reach of the San Xxxxxxx Valley-Southern California Aqueduct extending from the Delta to a reservoir near Los Banos in Merced County, to the extent required for water conservation through conveyance of water diverted from the Delta to offstream storage in said reservoir as determined by the State.

Related to Initial project conservation facilities

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Production Facilities (7 9) means "production equipment" and specially designed software therefor integrated into installations for "development" or for one or more phases of "production".

  • Transportation Facilities means any physical facility that moves or assist in the movement of people or goods including facilities identified in OAR 660-012-0020 but excluding electricity, sewage, and water systems.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Common Facilities means the facilities under D.G.sets/D.G.rooms, water storage tanks its pumping and supply system, sewerage & drainage systems, electric sub-station/ transformers/electric panels/distribution network, maintenance service rooms, lawns including lighting & services etc., roads, pathways & driveways including street lighting & services etc., guard posts, fire hydrants & fire fighting system etc. and all such facilities and areas for common use and excluded from the computation of Super Area of the Said Premises;

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • generation facility means a facility for generating electricity or providing ancillary services, other than ancillary services provided by a transmitter or distributor through the operation of a transmission or distribution system, and includes any structures, equipment or other things used for that purpose;

  • Project Facilities means all the amenities and facilities situated on the Site, as described in Schedule-C;

  • Wastewater Facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Redevelopment project means a specific construction project

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Additional Facilities has the meaning assigned to that term in Section 2.9(a).

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Pollution control facilities means water and air pollution control equipment and solid waste disposal facilities or any of them.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project Facility means facility being one or more of the following facilities as specified in the Special Conditions of Contract, being developed in accordance with the Project and the Detailed Project Implementation Report and includes all its buildings, equipment, facilities, software and systems and includes without limitation, where the circumstances so require, any expansion thereof from time to time and may include any new location to be separately mentioned in the Special Conditions of Contract.

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Common Areas and Facilities means collectively the Development Common Areas and Facilities and the Residential Common Areas and Facilities and all those parts and such of the facilities of the Development designated as common areas and facilities in any Sub-Deed;

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.