Joint Use Stadium definition

Joint Use Stadium means a quality multi-use outdoor stadium comprised of approximately 35,000 seats for collegiate and professional sports, including use for SDSU Division 1 football, National Collegiate Athletic Association Football Bowl Subdivision Division 1 programs, the National Football League, professional, premier, or Major League Soccer, collegiate and professional football bowl games, other sports, and other events, including without limitation concession areas, restaurants, bars, clubs, retail stores, kiosks, media facilities, athletic training and medical facilities, locker rooms, offices, meeting rooms, banquet facilities, ticketing facilities, on- and off-site signage, scoreboards, and other ancillary and support uses and facilities customarily made part of a stadium of the quality necessary to house collegiate and professional or premier sports, civic events, conventions, exhibitions, concerts and other outdoor events. SDSU also can explore, and proceed with, a phased build-out of such stadium that will allow SDSU to add on to such stadium at a later point to facilitate SDSU growth and acquisition of Potential Sports Partners.

Related to Joint Use Stadium

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Airport Ground Support Equipment means vehicles and equipment used at an airport to service aircraft between flights.

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Digital Cross Connect System or "DCS" is a function which provides automated Cross Connection of Digital Signal Level 0 (DS0) or higher transmission bit rate digital channels within physical interface facilities. Types of DCS include but are not limited to DCS 1/0s, DCS 3/1s, and DCS 3/3s, where the nomenclature 1/0 denotes interfaces typically at the DS1 rate or greater with Cross Connection typically at the DS0 rate. This same nomenclature, at the appropriate rate substitution, extends to the other types of DCS specifically cited as 3/1 and 3/3. Types of DCS that cross connect Synchronous Transport Signal level 1 (STS-1 s) or other Synchronous Optical Network (SONET) signals (e.g., STS-3) are also DCS, although not denoted by this same type of nomenclature. DCS may provide the functionality of more than one of the aforementioned DCS types (e.g., DCS 3/3/1 which combines functionality of DCS 3/3 and DCS 3/1). For such DCS, the requirements will be, at least, the aggregation of requirements on the "component" DCS. In locations where automated Cross Connection capability does not exist, DCS will be defined as the combination of the functionality provided by a Digital Signal Cross Connect (DSX) or Light Guide Cross Connect (LGX) patch panels and D4 channel banks or other DS0 and above multiplexing equipment used to provide the function of a manual Cross Connection. Interconnection is between a DSX or LGX to a Switch, another Cross Connection, or other service platform device.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Custom Local Area Signaling Service Features (CLASS) means certain call-management service features that are currently available from SBC-13STATE’s local networks. These could include: Automatic Call Back; Automatic Recall; Call Trace; Caller Identification and related blocking features; Calling Number Delivery; Customer Originated Trace; Distinctive Ringing/Call Waiting; Selective Call Forward; and Selective Call Rejection.

  • Common Channel Signaling (CCS means an out-of-band, packet-switched, signaling network used to transport supervision signals, control signals, and data messages. It is a special network, fully separate from the transmission path of the public switched network. Unless otherwise agreed by the Parties, the CCS protocol used by the Parties shall be SS7.

  • Customer-generator means a user of a net metering system.

  • Access Channel means any Channel, or portion thereof, designated for Access purposes or otherwise made available to facilitate or transmit Access programming or services.

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.

  • Child support services means any civil, criminal or administrative action taken by the Division of

  • Interconnection Service(s) means any Interconnection, Resale Services, 251(c)(3) UNEs, Collocation, functions, facilities, products or services offered under this Agreement.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Beam axis means a line from the source through the centers of the x-ray fields.

  • Development Area means that area to which a development plan is applicable.

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Central fill pharmacy means a pharmacy contracting with an originating pharmacy, or having the same owner as an originating phar- macy, that provides centralized prescription filling on behalf of the originating pharmacy pursuant to these rules.

  • Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.

  • Design-build team means an entity that consists of:

  • Area network means a type of electric distribution system served by multiple transformers interconnected in an electrical network circuit, which is generally used in large metropolitan areas that are densely populated, in order to provide highly reliable service. Area network has the same meaning as the term "distribution secondary grid network" found in institute of electrical and electronics engineers (IEEE) standard 1547 sub clause 4.1.4.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.