Examples of Lead Code in a sentence
Following the actual SHIPCHECK, the Lead Code, specifically, the Lead Designer, must assemble a SHIPALT Report.
The proposal sets out the concept of a Lead Code change (to be referred to in the UNC as a ‘principal’ change proposal) and Consequential Changes (to be referred to in the UNC as ‘subsidiary’ change proposals) for code changes affecting more than one energy code, allowing the panel for a Lead Code to refer decisions on a package of cross-code changes to the Authority in certain circumstances.
Operation Services (Warehouse) 253-2531 ZZONING & SOLID WASTE ENFORCEMENTPO Box 249, Bolivia, NC 28422 253-2200Location: Building I75 Courthouse Drive, NE Fax Numbers253-2221 Stone, Steve Deputy County Manager 2015steve.stone@brunswickcountync.govIsenhour, Jeff Lead Code Enforcement Officer 2225jeffrey.isenhour@brunswickcountync.govPosey, J.
The proposal also sets out the concept of a Lead Code and Consequential Changes for code changes affecting more than one energy code, allowing the panel for a Lead Code to refer decisions on a package of cross- code changes to the Authority in certain circumstances.
This may take place at the time of the usual Code Management meeting, if one exists, or at a separate time, based on mutual agreement by the Advanced User Support (AUS) Scrum Master, AUS Product Owner, Lead Code Manager (CM), and the Unified Forecast System (UFS) Application Lead.
REPEAT Violation of Chapter 42, Section 42-86 and Chapter 42, Section 42-87 of the Town of Palm Beach Code of Ordinances, grass not to exceed 8” in height and exterior surfaces to be kept painted and in good repair Lead Code Enforcement Officer Robert Walton said this case had been before the Board a number of times and had been postponed.
This is important as it means the Code Administrators are responsible for driving the Modification forward and are not held accountable by Ofgem/CCSG for changes they cannot control.• All Modifications that the CCSG determine have a cross code impact must have a Lead Code and that Lead Code shall produce a timetable as described above.
Any changes will still be progressed as a suit of modifications coordinated and managed by the Lead Code and the CCSG.
Violation of Chapter 18, Section 18-242, Subsection 1 (104.1.1) of the Town of Palm Beach Code of Ordinances, building permits required to construct, install, repair or alter any building or building system Lead Code Enforcement Officer Robert Walton gave a brief synopsis of the case and said that after many delays and postponements, the property owner was given until April 16, 2009 to obtain permits and get all required inspections.
It also sets out the concept of a Lead Code and Consequential Changes for code changes affecting more than one energy code, allowing the panel for a Lead Code to refer decisions on a package of cross-code changes to the Authority in certain circumstances.