Examples of Noise Guarantee in a sentence
Contractor shall, as part of the Work, perform, or cause to be performed, all design and engineering Work necessary so that the Work meets the requirements of this Agreement and is otherwise capable of achieving the Guaranteed Performance Levels while meeting the Emission Guarantees and the Noise Guarantee.
Contractor acknowledges and agrees that, subject to Contractor’s rights in connection with a Change in Law, it can conduct the Work for the Contract Price, in accordance with the Project Execution Plan and by the Guaranteed Substantial Completion Date for each Stage, and in accordance with GECP and all requirements of this Agreement, including Applicable Laws, the Emissions Guarantee, the Noise Guarantee and the Guaranteed Performance Levels (subject to Section 9.10).
The Net Energy Output of the Plant shall be determined pursuant to the Guaranteed Performance Test and shall be measured while the Plant is operating in compliance with the Noise Guarantee (excluding for this purpose all waivers and variances permitted under Applicable Permits).
Quality assurance and quality improvement play an important role in ensuring the success and sustainability of these efforts.
Describe guarantees for noise control (Noise Guarantee) to be made by the Contractor and penalties to be paid for nonperformance (to be incorporated in the Environmental Performance Guarantee).• Identify other facilities operated by the Proposer using similar methods and technologies similar to the proposed Noise Guarantee, as well as their performance record and overall effectiveness in noise reduction.
The President shall chair the meetings of the GA and of the Board.
Describe guarantees for noise control (Noise Guarantee) to be made by the Contractor and penalties to be paid for nonperformance (to be incorporated in the Environmental Performance Guarantee). Identify other facilities operated by the Proposer using similar methods and technologies similar to the proposed Noise Guarantee, as well as their performance record and overall effectiveness in noise reduction.
The GPL Correction Plan shall be amended in accordance with Section 9.10.3 as may be necessary with respect to Work necessary to satisfy the Noise Guarantee.
If FERC does not agree that such Stage satisfies the Noise Guarantee, Contractor shall amend its GPL Correction Plan, using the same procedures as described in Section 9.10.2, to include the Work that Contractor will undertake to correct, repair or remedy any of the Work necessary to cause the Stage to satisfy the Noise Guarantee.
The Parties understand and agree that Contractor’s obligation to achieve the Minimum Performance Level simultaneously with achievement of the Noise Guarantee, is an absolute obligation, which must be achieved.