Partitions definition

Partitions. All existing partitions shall be demolished.
Partitions means walls that divide a space that are not a
Partitions. PERMANENT (APR 2015) .......................................................................................................................................... 17 3.27 INSULATION: THERMAL, ACOUSTIC, AND HVAC (SEP 2013) ....................................................................................................... 17 3.28 WALL FINISHES – SHELL (SEP 2015) .............................................................................................................................................. 17 3.29 PAINTING – SHELL (JUN 2012) ........................................................................................................................................................ 17 3.30 FLOORS AND FLOOR LOAD (APR 2015) ......................................................................................................................................... 17 3.31 FLOOR COVERING AND PERIMETERS – SHELL (SEP 2013) ......................................................................................................... 17 3.32 MECHANICAL, ELECTRICAL, PLUMBING: GENERAL (APR 2011) ................................................................................................. 18 3.33 BUILDING SYSTEMS (APR 2011) ..................................................................................................................................................... 18 3.34 ELECTRICAL (JUN 2012) .................................................................................................................................................................. 18 LEASE NO. VA-101-17-L-XXXX LESSOR: ______ GOVERNMENT: ________ GSA FORM L100 (10/16)

Examples of Partitions in a sentence

  • Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements.

  • The Contractor shall clean stairs and stairways, including landings, in accordance with the specifications for Clean Floors: Resilient Tile & Concrete and Walls, Wall Cabinets & Partitions referenced in Sections 1, 4, and 10.

  • The Contractor shall clean stairs and stairways, including walls and landings, in accordance with the specifications for Clean Floors in (i) Article XVIII, Section 1: Resilient Tile and Concrete/Hard Surface, (ii) Article XVIII, Section 4 Buffing Floors: Resilient Tile and Concrete/Hard Surface, and (iii) Article XVIII, Section 10 Clean and Walls, Wall Cabinets & Partitions.

  • Architectural Application and Installation of Operable Partitions.

  • Partitions to be shown lightly with switches located indicating fixtures to be controlled.


More Definitions of Partitions

Partitions musicians will play gamuts taken from many kinds of subsets obtained by partitioning the previously mentioned pitch generation schemes. I can also think of ‘meteor clouds’ of timbral, distant intervals, generated by the computer and set against the ensemble’s textures.
Partitions. All glass partitions will be washed to remove fingermarks and smudges.
Partitions. All interior partitions to be demolished.
Partitions. GENERAL (APR 2011) Partitions in public areas shall be marble, granite, hardwood, or sheetrock covered with durable wall covering or high performance coating, or equivalent pre-approved by the LCO.
Partitions. Lessor will provide perimeter walls that will be drywalled. No interior walls will be provided by Lessor.
Partitions. PERMANENT (SEP 2013) ................................................................................. 21 3.24 INSULATION: THERMAL, ACOUSTIC, AND HVAC (SEP 2013) ............................................. 21 3.25 WALL FINISHES – SHELL (SUCCEEDING) (JUN 2012) .......................................................... 22 3.26 PAINTING - SHELL (JUN 2012) ................................................................................................ 22 3.27 FLOORS AND FLOOR LOAD (AUG 2011) ................................................................................ 22 3.28 FLOOR COVERING AND PERIMETERS – SHELL (SUCCEEDING) (JUN 2012) ..................... 22 3.29 MECHANICAL, ELECTRICAL, PLUMBING: GENERAL (APR 2011) ...................................... 22 3.30 BUILDING SYSTEMS (APR 2011) ............................................................................................. 22 3.31 ELECTRICAL (JUN 2012) .......................................................................................................... 23 3.32 DRINKING FOUNTAINS (APR 2011) ......................................................................................... 23 3.33 REST ROOMS (SEP 2013) ........................................................................................................ 23 3.34 PLUMBING FIXTURES: WATER CONSERVATION (DEC 2011) .............................................. 24 3.35 JANITOR CLOSETS (SUCCEEDING) (JUN 2012) .................................................................... 24 3.36 HEATING VENTILATION AND AIR CONDITIONING – SHELL (SEP 2013) ............................. 24 3.37 TELECOMMUNICATIONS: DISTRIBUTION AND EQUIPMENT (SUCCEEDING) (SEPT 2011)25 3.38 TELECOMMUNICATIONS: LOCAL EXCHANGE ACCESS (JUN 2012) .................................. 25 3.39 LIGHTING: INTERIOR AND PARKING - SHELL (JUN 2012) ................................................... 25 3.40 ACOUSTICAL REQUIREMENTS (SEP 2013) ........................................................................... 26 3.41 INDOOR AIR QUALITY DURING CONSTRUCTION (SEP 2013) .............................................. 26 3.42 SYSTEMS COMMISSIONING (APR 2011) ................................................................................ 27 SECTION 4 DESIGN, CONSTRUCTION, AND POST AWARD ACTIVITIES .............................. 27 4.01 SCHEDULE FOR COMPLETION OF SPACE (SUCCEEDING) (JUN 2012) .............................. 27 4.02 ACCEPTANCE OF SPACE (SUCCEEDING) (SEP 2013) ...............
Partitions. SUBDIVIDING (SEP 2015) ......................................................................................................................................... 29 5.10 WALL FINISHES (JUN 2012) ............................................................................................................................................................. 29 5.11 PAINTING – TI (SEP 2013) ................................................................................................................................................................ 29 5.12 FLOOR COVERINGS AND PERIMETERS (APR 2015) ..................................................................................................................... 29 5.13 HEATING AND AIR CONDITIONING (JUN 2012) .............................................................................................................................. 30 5.14 ELECTRICAL: DISTRIBUTION (SEP 2015) ......................................................................................................................................