Preliminary Feasibility Study definition

Preliminary Feasibility Study means a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, has been established, and which, if an effective method of mineral processing has been determined, includes a financial analysis based on reasonable assumptions of technical, engineering, operating, economic factors and the evaluation of other relevant factors which are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral reserve.
Preliminary Feasibility Study means a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental considerations and the evaluation of any other relevant factors which are sufficient for a Qualified Person, acting reasonably, to determine if all or part of the Mineral Resource may be classified as a Mineral Reserve.
Preliminary Feasibility Study means a study that

Examples of Preliminary Feasibility Study in a sentence

  • Mine Development Associates April 29, 2016 Technical Report and Preliminary Feasibility Study, San Rafael Deposit, Sinaloa, Mexico – Americas Silver Corp.

  • A Probable Mineral Reserve has a lower level of confidence than a Proven Mineral Reserve.A Mineral Reserve is the economically mineable part of the Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study.

  • A “Proven Mineral Reserve” is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study.

  • A “Probable Mineral Reserve” is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study.

  • This work led to a completed Preliminary Feasibility Study for the KSM Project in March 2010, which was updated in June, 2011.


More Definitions of Preliminary Feasibility Study

Preliminary Feasibility Study means a comprehensive study, prepared in good faith, of the viability of exploiting a mineral deposit on the Fye Property that has advanced to a stage where the mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, has been established, and includes an effective method of mineral processing and a financial analysis based on reasonable assumptions of technical, engineering, operating, economic factors and the evaluation of other relevant factors which are sufficient for a Qualified Person, as defined in §14.2, acting reasonably, to determine that all or part of the mineral resource may be classified as a mineral reserve.
Preliminary Feasibility Study or "pre-feasibility study" means a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method, in the case of underground
Preliminary Feasibility Study means a preliminary analysis of the economic feasibility of a PPP Project.
Preliminary Feasibility Study means an assessment of the economic potential for mining of the Poker Flats property short of a Mining Feasibility study, subject to the stipulations listed in Section 3.2 (b) below;
Preliminary Feasibility Study means a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on the Modifying Factors and the evaluation of any other relevant factors which are sufficient for a Qualified Person, acting reasonably, to determine if all or part of the Mineral Resource may be converted to a Mineral Reserve at the time of reporting. A Pre-Feasibility Study is at a lower confidence level than a Feasibility Study.
Preliminary Feasibility Study means a study regarding the Conversion Process prepared in accordance with Section 7.2 which shall evaluate the technical and economic feasibility of constructing and operating a Conversion Facility.
Preliminary Feasibility Study is defined in the CIM Definition Standards attached as Schedule C.