Preliminary Space Plan definition

Preliminary Space Plan shall have the meaning assigned to such term in Section 5.7(a).
Preliminary Space Plan. Landlord to provide sixteen cents ($0.16) per usable square foot. Said allowance is to pay for Tenant's space planner to design a preliminary drawing of said space.
Preliminary Space Plan means a space plan prepared by Architect depicting all improvements and alterations desired by Tenant to be installed or constructed in the Premises. Landlord shall provide to Tenant an allowance up to ONE THOUSAND THIRTY-SIX AND 40/100 DOLLARS ($1,036.40) to reimburse Tenant for the cost of one (1) test-fit plan (the “Test-Fit Allowance”). The Test-Fit Allowance shall be in addition to, and shall not be deducted from, the Construction Allowance.

Examples of Preliminary Space Plan in a sentence

  • Landlord has caused its architect, Little Architects (“Landlord’s Architect”), to prepare the preliminary space plan, showing the preliminary specifications for the Leasehold Improvements (the “Preliminary Space Plan”), which Preliminary Space Plan has been approved by Landlord and Tenant, a copy of which is attached hereto as Exhibit E-1, but remains subject to further revisions (such Preliminary Space Plan, as finally approved by Landlord and Tenant, being the “Space Plan”).

  • Preliminary Space Plan [GRAPHIC OMITTED] EXHIBIT A ATTACHED TO and made a part of the Standard Office Building Lease dated April 15, 2003 (the "Standard Lease"), between BISCAYNE CENTRE, LLC., as LANDLORD, and EPIXTAR MANAGEMENT CORP.

  • The Final Plans will be submitted to Landlord in accordance with the delivery requirements of Section 30.1 of the Lease and via email for signature to confirm that they are consistent with the Preliminary Space Plan.

  • Xxxxxx St. Suite 520 Chicago, Illinois 60614 Attn: Xxxxx Xxxxx RE: Commerce Point I Paylocity 3rd Floor Job # 0426-AS Concept #5 Dear Ms. Brush: Attached you will find the PDF file of the Preliminary Space Plan for the above prospective tenant.

  • Notwithstanding anything to the contrary contained herein, Landlord agrees that there are no Specialty Alterations on the Preliminary Space Plan.

  • Landlord and Tenant acknowledge that the tenant improvements contemplated in the Preliminary Space Plan will exceed Landlord's contribution.

  • Landlord or Landlord's Architect shall submit the Working Drawings to Tenant for Tenant's review to confirm compliance with the Preliminary Space Plan, and Tenant shall notify Landlord and Landlord's Architect within five (5) business days, after delivery thereof of any requested revisions.

  • The final space plan (the "Final Space Plan") shall be consistent with the Preliminary Space Plan and shall include a detailed layout and designation of all life science systems, labs and lab systems, offices, rooms and other partitioning, their intended use, and equipment to be contained therein.

  • Landlord shall be responsible for constructing, at its expense, the "Building Shell" as described in Exhibit B hereto, and Tenant shall, at Tenant's sole expense (subject to Paragraph 8(b) below), and upon the terms set forth herein, make improvements to the Premises (the "Tenant Improvements") specified by Tenant as generally depicted in a preliminary space plan (the "Preliminary Space Plan") to be submitted to Landlord.

  • Promptly following the execution of this Lease, to the extent not theretofore approved by the parties, Landlord shall cause such architect as Landlord may reasonably designate to prepare and submit to Tenant for its approval a final space plan for the Tenant Improvements consistent with the Preliminary Space Plan which shall include specifications sufficient to allow preliminary estimated pricing for the costs of construction of the Tenant Improvements (the "Final Space Plan").


More Definitions of Preliminary Space Plan

Preliminary Space Plan means a space plan prepared by the Architect depicting all improvements and alterations to be installed or constructed with respect to the Tenant Improvements.
Preliminary Space Plan means a space plan prepared by Architect depicting all improvements and alterations desired by Tenant to be installed or constructed in the Premises. Landlord shall provide to Tenant an allowance up to ONE THOUSAND THIRTY- SIX AND 40/100 DOLLARS ($1,036.40) to reimburse Tenant for the cost of one (1) test-fit plan (the “Test-Fit Allowance”). The Test- Fit Allowance shall be in addition to, and shall not be deducted from, the Construction Allowance.

Related to Preliminary Space Plan

  • Space Plan herein means, to the extent required by the nature of the Work, detailed plans (including any so-called “pricing plans”), including a fully dimensioned floor plan and drawn to scale, showing: (i) demising walls, interior walls and other partitions, including type of wall or partition and height, and any demolition or relocation of walls, and details of space occupancy and density, (ii) doors and other openings in such walls or partitions, including type of door and hardware, (iii) electrical and computer outlets, circuits and anticipated usage therefor, (iv) any special purpose rooms, any sinks or other plumbing facilities, heavy items, and any other special electrical, HVAC or other facilities or requirements, including all special loading and related calculations, (v) any space planning considerations to comply with fire or other codes or other governmental or legal requirements, (vi) finish selections, and (vii) any other details or features requested by Architect, Engineer or Landlord, or otherwise required, in order for the Space Plan to serve as a basis for Landlord to approve the Work, and for Tenant to contract and obtain permits for the Work, or for the Space Plan to serve as a basis for preparing Construction Drawings.

  • Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.

  • Building Drain means that part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to the building sewer, beginning five (5) feet (1.5 meters) outside the inner face of the building wall.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Preliminary plat means a map showing the salient features of a proposed subdivision submitted to an approving authority for purposes of preliminary consideration.

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Work area means a room or defined space in a workplace where hazardous chemicals are produced or used, and where employees are present.

  • Work space means that portion of the court’s facilities dedicated to each court reporter, including but not limited to actual space in the courtroom and any designated office space.

  • Constructional Plan means all appliances or things of whatsoever nature required for the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.

  • Preliminary Plans means a site plan, architectural floor plans, elevations, outline specifications and a cost estimate for each utility, site development, conversion, and remodeling project. The drawings shall be sufficiently descriptive to accurately convey the location, scope, cost and the nature of the improvement being proposed.