Primary Meter definition
Examples of Primary Meter in a sentence
Plane Of Array Irradiance- Primary Meter ▇▇▇▇▇/Meter Sq. ± 25 W/m² Measured with a Class II pyranometer or equivalent equipment.
If the testing reveals that the Primary Meter is inaccurate by more than 2%, CPC will pay for the cost and expense of the testing and also the cost and expense of repairing or replacing the Primary Meter.
Plane Of Array Irradiance- Primary Meter Status ON/OFF Communications Online Offline Status Plane Of Array Irradiance- Secondary Meter Status ON/OFF Communications Online Offline Status Unit Net MW The resource's real power output measured at the low side of the step-up transformer.
Plane Of Array Irradiance- Primary Meter Status ON/OFF Communications Online Offline Status Plane Of Array Irradiance- Secondary Meter Status ON/OFF Communications Online Offline Status For Facilities equipped with DC tied, behind a solar inverter, Storage Resources the following Power Plant Controller Output Points shall also be reported to Buyer1 Unit Net MW The resource's real power output measured at the low side of the step-up transformer.
The Point of Delivery for the electricity supplied hereunder shall be Primary Meter and maintenance by the Distributor of approximately the above stated voltage and frequency at said Point of Delivery shall constitute delivery of electricity for the purpose of this contract.
For Primary Meter and ▇▇▇▇’▇ ▇▇▇▇ Meter failure, recourse to the relevant orifice differential pressures, meter pressure, meter temperature and calorific value should be made to manually determine flow through the meter.
TABLE 1 - METERING UNCERTAINTY Maximum Flow Rate GW□ Range as % of Maximum Flow Rate 20 - 30% 30 - 100 % Primary Meter [Fuel Gas Meter] [Auxiliary Gas Meter] The meters will have a level of uncertainty of +/- [( )]%] of the flow rate over the expected flow range.
TABLE 1 - METERING UNCERTAINTY Maximum Flow Rate GW Range as % of Maximum Flow Rate 20 - 30% 30 - 100 % Primary Meter [Fuel Gas Meter] [Auxiliary Gas Meter] The meters will have a level of uncertainty of +/- [( )]%] of the flow rate over the expected flow range.
Prior to the Lease Commencement Date, Lessor shall install a submeter (the “Submeter”) to measure the water/sewer usage of the adjacent premises and Lessee will be charged by Lessor for the difference between the usage recorded by the Primary Meter and the Submeter.
These facilities are located in Spotsylvania County at The Virginia Railway Express Maintenance Facility in Crossroads Business Park and are to serve and consist of approximately 5,775’ of 4/0 alug 35kv conductor, 1,965’ of 1/0 alug 35kv cable, (1) 35kv Pad mounted Primary Meter, (2) 35kv 75kva pad mounted transformers, (2) 35kv 2000kva pad mounted transformers, (1) 35kv 3000kva pad mounted transformer, (3) sectionalizing cabinets and associated equipment.