Examples of Primary Metering System in a sentence
If JPS conducts a physical reading of the Primary Metering System, it shall permit a representative of the Company to witness and verify such reading; provided, however, that the failure of the Company to send a representative to witness any such reading shall not affect the validity of such inspection or test or reading.
If JPS conducts a physical reading of the Primary Metering System, it shall give reasonable prior notice to the Company of the time when such reading will be done.
Upon commissioning the Primary Metering System but prior to the first synchronization of the Facility, the Company shall not access, read, reconfigure or otherwise tamper or interfere with, nor cause any person other than JPS to access, read or reconfigure the Primary Metering System.
The Company shall design, finance, construct and install the Primary Metering System and shall design, finance, construct, install, own, operate and maintain the Backup Metering System which shall be owned by the Company.
The BOT Company will at its own cost, design, build, operate and maintain the overhead lines and connected equipment, the Primary Metering System and a Check Metering System from the [●]kV side of the BOT Company’s generator step-up transformers to the Interconnection Point.
Testing, inspection, repair, recalibration and replacement of the Primary Metering System and Backup Metering System shall be performed by the Parties in accordance with Schedule 5.
In the event that the tests indicate that the Primary Metering System is inaccurate by more than the maximum limit of inaccuracy as stated in Table 2 of Schedule 6, any payments made by EVN to the BOT Company that were calculated on the basis of the inaccurate metering devices shall be retroactively adjusted by a payment or credit on the next invoice.
The Company shall design, finance, construct and install the Primary Metering System.
JPS shall promptly take all reasonable actions to accept and take transfer of such Primary Metering System.
After the Commercial Operations Date, JPS shall be responsible for (a) the operation and maintenance of the Primary Metering System, (b) the operation and maintenance of the auxiliary and interconnecting equipment on the JPS side of the Interconnection Point and (c) coordination of switching operations of the Interconnection Facilities, all in accordance with the terms of this Agreement, the Operating Procedures, Prudent Utility Practice and all applicable laws, rules, regulations and ordinances.