Project Phase 2B definition

Project Phase 2B means the second part of Project Phase 2 in which any Therapy which has undergone molecular specificity testing undergoes pre-clinical development;
Project Phase 2B means the second part of Project Phase 2 in which [***];

Examples of Project Phase 2B in a sentence

  • CONTRACTOR has by written agreement dated , entered into a contract with CITY for BID # 1819-244 and titled East-West Transmission Main Project Phase 2B in accordance with drawings and specifications prepared by CITY and which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.

  • In fact, more than 20 percent of‌‌‌‌‌‌‌‌‌‌TIPHomes in low- or moderate- risk flood areas are five times more likely to experience a flood than a fire in a 30-year period.‌‌‌‌‌‌‌ MYTH #5‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌MINOR FLOODING WON’T CAUSE MUCH DAMAGE.‌‌‌‌‌‌‌‌Even minor flooding can cause significant damage to a home and its contents.

  • Increase the 2016/17 gross capital budget in the amount of $75,000 for a preliminary design for the Herring Cove Water Servicing Project Phase 2B and Phase 4, with funding as a withdrawal from General Contingency Reserve, Q421; and3.

  • CONTRACTOR has by written agreement dated _ entered into a contract with CITY for BID #1819-244 and titled East-West Transmission Main Project Phase 2B in accordance with drawings and specifications prepared by CITY and which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.

  • CEQA requires the Metro Gold Line Foothill Extension Construction Authority (“Construction Authority”), as the decision-making agency, to balance as applicable the economic, legal, social, technological, or other benefits of the Project Modifications analyzed in the Final SEIR for the Metro Gold Line Foothill Extension Project Phase 2B (“Project”) against its unavoidable environmental effects when determining whether to approve the Project Modifications.

  • The Board of Supervisors for Carson City, Nevada at their publicly noticed meeting of June 20, 2019, approved the acceptance of the attached Contract hereinbefore identified as CONTRACT No. 1819-244 and titled East-West Transmission Main Project Phase 2B.

  • Achieve the scheduled substantial completion date of April 26, 2023 for Project Phase 2B components.

  • Authorize a sole source award and reimbursement to the Halifax Regional Water Commission in the amount of $75,000 for the preliminary design of a revised scope of work for the Herring Cove Water Servicing Project Phase 2B and Phase 4.

  • In comparison, capital grants and contributions decreased $5.0 million or 62 percent in 2019 primarily due to a $4.9 million private developer contribution in 2018 for the RBM Development Project Phase 2B in Madisonville.

  • Review of the KRCD McMullin On-Farm Flood Capture Project, Phase 2B.

Related to Project Phase 2B

  • Development Phase means the period before a vehicle type is type approved.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Phase 1 Study means a clinical study of a drug candidate in human patients with the primary objective of characterizing its safety, tolerability, and pharmacokinetics and identifying a recommended dose and regimen for future studies as described in 21 C.F.R. §312.21(a), or a comparable clinical study prescribed by the relevant Regulatory Authority in a country other than the United States. The drug candidate can be administered to patients as a single agent or in combination with other investigational or marketed agents.

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Development Project means a project for the development of land within a project area.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Work means the work required to complete the Project.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Project Scope means the description or activity of work to be accomplished on the project.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Project area budget means a multiyear projection of annual or cumulative

  • Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).

  • Phase III Study means a human clinical trial that is prospectively designed to demonstrate statistically whether a product is safe and effective for use in humans in a manner sufficient to obtain regulatory approval to market such product in patients having the disease or condition being studied as described in 21 C.F.R. § 312.21(c) (FDCA), as amended from time to time, and the foreign equivalent thereof.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Phase II Study means a human clinical trial, for which the primary endpoints include a determination of dose ranges and/or a preliminary determination of efficacy in patients being studied as described in 21 C.F.R. § 312.21(b) (FDCA), as amended from time to time, and the foreign equivalent thereof.

  • Project Year means the twelve-month period beginning from the Effective Date and ending twelve months thereafter (the First Project Year), and any twelve-month period beginning at the end of the First Project Year, or the end of subsequent Project Years;

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Phase 3 means the period commencing on the day after the Phase 2 implementation date and ending on the Phase 3 implementation date (as defined below).

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.