Proposed Project Report definition

Proposed Project Report means a schedule prepared by the IPA substantially in the form of Exhibit A-1 appended hereto, which contains the Scheduled Energized Date and other information related to the Project.” The following is added as Section 1.51.3:

Examples of Proposed Project Report in a sentence

  • The Project must be Energized by the Scheduled Energized Date indicated on the Proposed Project Report substantially in the form of Exhibit A-1 to this REC Contract.

  • If an extension is granted to the Scheduled Energized Date, the revised Scheduled Energized Date shall be specified in an amended Proposed Project Report substantially in the form of Exhibit A-1 to the REC Contract and provided by the IPA to Buyer and Seller.

Related to Proposed Project Report

  • Project Report means a summary statement of the likely environmental effects of a proposed development referred to in section 58;

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Progress Report means the report similar in form and content to that attached hereto as Appendix III.

  • Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.

  • Punch List means the list of items, prepared in connection with the inspection of the Project by the Owner’s Representative or Architect in connection with Substantial Completion of the Work or a portion of the Work, which the Owner’s Representative or Architect has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Project Engineer means the surveyor or engineer employed by or private

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Survey Report means a report of the results of a Survey, containing the information set out in clause 12.4 and Schedule 6.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.