Punchlist Item definition

Punchlist Item means an item that is minor in nature (i.e., an item the non-completion of which will not affect the safe, reliable, efficient, and continuing ownership, possession, use, operation, maintenance, or repair of the Project), is part of the Work, and has not been completed as of Substantial Completion. Without limiting the foregoing, no item or matter that may prevent the Project from achieving Substantial Completion or may cause an outage of, or a reduction in the production or delivery of electrical power from, the Project or is by design an integral part of a system required for operation of the Project may be considered a Punchlist Item. Examples of typical Punchlist Items include completion of painting, landscaping, final Project clean up, and final grading.
Punchlist Item means those administrative items or other minor items of the Work, and consistent with GAEP, the omission of which would not adversely affect the safety, performance, or reliability of the start up and testing or Commercial Operation of a component or the Facility, including but not limited to painting, insulation repairs, labels and landscaping.
Punchlist Item means an item that is minor in nature (i.e., an item the non-completion of which will not affect the safe, reliable, efficient, and continuing ownership, possession, use, operation, maintenance, or repair of the Project), is part of the Work, and has not been completed as of Mechanical Completion or Substantial Completion, as applicable. Without limiting the foregoing, no item or matter that may prevent the Project from achieving Substantial Completion or may cause an outage of, or a reduction in the production or delivery of electrical power from, the Project or is by design an integral part of a system required for operation of the Project may be considered a Punchlist Item. Examples of typical Punchlist Items include completion of painting, landscaping, final Project clean up, and final grading.

Examples of Punchlist Item in a sentence

  • Prior to Commercial Operation, Owner and GEC shall inspect the Facility and GEC shall prepare a listing of the outstanding Punchlist Items and provide it to Owner together with an estimate of the cost and time to complete or correct each such Punchlist Item.

  • Prior to Commercial Operation, GEC and Contractor shall inspect the Facility and Contractor shall prepare a listing of the outstanding Punchlist Items and provide it to GEC together with an estimate of the cost and time to complete or correct each such Punchlist Item.

  • The items included in such list are herein referred to as the “Punchlist Items.” If the parties are unable to agree whether any particular item is to be included as a Punchlist Item, then the decision of the Architect as to such item shall be binding.

  • Prior to Substantial Completion, Owner and Contractor shall inspect the Facility and Contractor shall prepare a listing of the outstanding Punchlist Items and provide it to Owner together with an estimate of the cost and time to complete or correct each such Punchlist Item.

  • Yes, the scientific com- munity can stand to learn a lot from the Ig Nobels.

  • Complete each Punchlist Item in accordance with the Project Schedule.

  • If Landlord fails to complete any particular Punchlist Item within ninety (90) days after written notice from Tenant that the same remains Project Description: Work shall include demising walls to underside of structure; interior walls to underside of suspended ceiling; general office finishes including floors, walls doors frames and hardware, suspended acoustic ceilings; HVAC in offices; wet fire sprinkler system; restroom and plumbing; electrical and lighting systems.

  • Lessee agrees that it will sign-off, as having been completed, on any completed Punchlist Item upon request by Lessor within five (5) business days of Lessor’s request.

  • Lessee agrees that it will sign-off, as having been completed, on any completed Punchlist Item upon request by Lessor within five (5) business days of Lessor's request.

  • If the parties are unable to agree whether any particular item is to be included as a Punchlist Item, then the decision of the Architect as to such item shall be binding.


More Definitions of Punchlist Item

Punchlist Item means any item of uncompleted Work that (considered individually or in the aggregate of the Punchlist Items) does not or will not adversely affect the performance of the Facility or the ability of Owner to operate the Facility in the ordinary course of business in accordance with GAIEP.
Punchlist Item means minor, non-operational items that HI-POWER or ACRO identifies as requiring completion and that individually or in the aggregate do not affect the safety, reliability, and continuous commercial operability of the Work or the ability to commission and test the Work and that will remain to be performed to complete the applicable portion the Work. "Purchase Order" means HI-POWER's purchase order issued to ACRO hereunder, which will include the Basic Purchase Order Terms. "Purchaser" means a purchaser of, directly or indirectly, some or all of either HI-POWER’s assets or equity interests. "Reimbursement Authorization" has the meaning set forth in Section 6.2(a). "Release", "Released" or "Releasing" means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment (including the abandonment or discarding of barrels, containers, and other closed receptacles containing any Hazardous Material, but excluding (a) emissions from the engine exhaust of a motor vehicle and (b) the normal application of fertilizer). "Renewal Term" has the meaning set forth in Section 2.6(b). "Representatives" has the meaning set forth in Section 17.3. "Requirements" means, collectively: (i) Prudent Industry Standards; (ii) Applicable Laws; (iii) all Governmental Approvals; (iv) the requirements of the Technical Specifications; (v) the design, plans, and

Related to Punchlist Item

  • Punchlist Items means any items necessary at the time of the issuance of a temporary certificate of occupancy to complete fully the renovation of the Project Facilities in accordance with the Plans and Specifications for the Project Facilities, or required for the issuance of a final certificate of occupancy or its equivalent.

  • Punch List Items means such items (i) as are reasonably necessary or appropriate to fully complete the construction, equipping and furnishing of the Hotel in accordance with this Contract and (ii) that, unless otherwise agreed by Buyer in its sole discretion, (a) individually and in the aggregate do not and will not prohibit, cause a delay in or otherwise adversely affect, under applicable Legal Requirements, the Franchise Agreement or otherwise, the opening of the Hotel for business to the public or the continued occupancy and operation of the Hotel as contemplated under the Brand and (b) may be corrected or completed, subject to delays caused by Force Majeure, within not more than sixty (60) days.

  • Punchlist means a list of items of Work to be completed or corrected by Contractor after Substantial Completion. Punchlists indicate items to be finished, remaining Work to be performed, or Work that does not meet quality or quantity requirements as required in the Contract Documents.

  • Punch List means the list of items, prepared in connection with the inspection of the Project by the Owner’s Representative or Architect in connection with Substantial Completion of the Work or a portion of the Work, which the Owner’s Representative or Architect has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

  • Contract Item or “Contract Items” means the list of items identified in Section

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Major repair means either: (1) for a dispersal system, repairs required for an OWTS dispersal system due to surfacing wastewater effluent from the dispersal field and/or wastewater backed up into plumbing fixtures because the dispersal system is not able to percolate the design flow of wastewater associated with the structure served, or (2) for a septic tank, repairs required to the tank for a compartment baffle failure or tank structural integrity failure such that either wastewater is exfiltrating or groundwater is infiltrating.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Tenant Improvements Defined in Exhibit B, if any.

  • Standard Specifications means all applicable legal requirements pertaining to the development of the Property including, but not limited to, Master Subdivision Plan, applicable permits, and construction drawings required for all Infrastructure, including, without limitation, the Town's Unified Development Ordinance, Knightdale's Water Allocation Policy (Ordinance # 13-06- 19-001 and Ordinance # 00-00-00-000) and Standard Specifications and Construction Details Manual. The failure of this Agreement to describe any other permit, condition, or term of restriction applicable to the Property does not relieve Developer of the necessity of complying with the same.

  • Construction Budget means the cost of acquisition, installation, testing, constructing and developing any Property as determined by the Construction Agent in its reasonable, good faith judgment.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Work loss means loss of income from work the injured victim would have performed if the injured victim had not been injured and expenses reasonably incurred by the injured victim in obtaining services in lieu of those the injured victim would have performed for income, reduced by any income from substitute work the injured victim was capable of performing but unreasonably failed to undertake.

  • Construction Work means any work in connection with⎯

  • Certificate of Substantial Completion means the certificate executed by the A/E, ODR and Contractor that documents to the best of A/E’s and ODR’s knowledge and understanding, Contractor’s sufficient completion of the work in accordance with the Contract, so as to be operational and fit for the use intended.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Nonconforming structure means a structure the size, dimension

  • Line Item means a field of information (or a combination of fields of information) to be entered in a Settlement Schedule by any Participating Subscriber in relation to a Conveyancing Transaction.

  • Change Order means a written order to the Contractor signed by the Contracting Officer, issued after execu- tion of the Contract, authorizing a change in the term or scope of the Contract.

  • Contract Schedule means a schedule to this Contract;