Quantity Surveyor means a duly qualified quantity surveyor of at least five (5) year’s experience in the assessment of building material and construction costs. Quantity Surveyor Assessment means an assessment by an independent Quantity Surveyor of the Construction Cost to the reasonable satisfaction of the Council. Regulation means the Environmental Planning and Assessment Regulation, 2000 (as amended).
Surveyor means a professional surveyor licensed under article 20 of the occupational code, 1980 PA 299, MCL 339.2001 to 339.2014.
Assistant Hydrographic Surveyor means the Assistant Hydrographic Surveyor of the Authority, as the case may be
Survey shall have the meaning set forth in Section 4.1.
Engineer’s Representative means the official in the civil/ electrical engineering department who is authorized to be in-charge of the work to which these presents relate. It shall include any other official nominated to attend to the supervision of day to day execution of the work to which this CONTRACT relates.
Sanitary survey means an onsite review of the water source, facilities, equipment, operation and maintenance of a public water system for the purposes of evaluating the adequacy of such source, facilities, equipment, operation and maintenance for producing and distributing safe drinking water.
Professional land surveyor means a professional land surveyor licensed under ch. 443.
Land surveyor means the land surveyor appointed by the Seller, to act as such from time to time in respect of the Development or a member of a firm so appointed.
Surveyor-General means the Surveyor-General as defined in the Land Survey Act, 1997 (Act No. 8 of 1997);
Professional surveyor means a person who, by reason of knowledge of law, mathematics, physical sciences, and techniques of measuring acquired by professional education and practical experience, is qualified to engage in the practice of professional surveying.
Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;
Purveyor means an agency, subdivision of the state, municipal corporation, firm, company, mutual or cooperative association, institution, partnership, or person or other entity owning or operating a public water system. Purveyor also means the authorized agents of these entities.
Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.
Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).
Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.
Architect/Engineer (A/E means a person registered as an architect pursuant to Tex. Occ. Code Ann., Ch. 1051, as a landscape architect pursuant to Tex. Occ. Code Ann., Ch. 1052, a person licensed as a professional engineer pursuant Tex. Occ. Code Ann., Ch. 1001, and/or a firm employed by Owner or Design-Build Contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.
Record of survey map means a map of a survey of land prepared in accordance with Section 10-9a-603, 17-23-17, 17-27a-603, or 57-8-13.
Water purveyor means the owner or official custodian of a public water system.
Goods Specification any specification for the Goods including any relevant plans or drawings, that is agreed in writing by the Reseller and Voip-Unlimited.
Approved Valuer means a firm of valuers recognized as such by the Income Tax Department and having experience of valuing at least 5 (five) properties exceeding Rs. 100 cr. (Rupees one hundred crore) each in value;
Sewage sludge fee weight means the weight of sewage sludge, in dry U.S. tons, excluding admixtures such as liming materials or bulking agents. Annual sewage sludge fees, as per section 3745.11(Y) of the Ohio Revised Code, are based on the reported sludge fee weight for the most recent calendar year.
Site Engineer means an Engineer appointed by the SBIIMS at site as their representative for day-to-day supervision of work and to give instructions to the contractors.
Project Engineer means the surveyor or engineer employed by or private
Survey area means the area of land or waters the subject of a Survey, or proposed to be the subject of a Survey.
Physical Therapy Compact Commission or "commission" means the national administrative body whose membership consists of all states that have enacted the compact.
MONTHLY KILOMETREAGE STATEMENT CUM BILL means the format specified by the Company.