Ready for Testing definition

Ready for Testing when the Supplier has satisfactorily completed the provisioning of that part of an Interconnect Link that is under his direct control;
Ready for Testing means that (1) all related power and environmentals required under this Agreement are functional, (2) entrance facilities are in place and functional, and (3) connectivity to the Willxxxx Xxxwork is established. Switch Service Dates: Kansas City Switch - Ready for Call-Through Testing - **** Houston Switch - Ready for Call-Through Testing - **** San Francisco Switch - Ready for Call-Through Testing - **** Anaheim Switch - Ready for Call-Through Testing - ****
Ready for Testing when BT has satisfactorily completed the provisioning of that part of an ISH Link that is under its direct control and the Operator has been notified; “Receiving Party” a Party receiving information from the Disclosing Party;

Examples of Ready for Testing in a sentence

  • Such access will be available to the Customer for up until 15 (fifteen) days after the Supplier notifies the Customer of the Software Ready for Testing.

  • As a student in the Early Childhood Education Program, students must maintain the confidence and trust of all children, teachers, co-workers, directors and child care facilities in which they are assigned or affiliated.Discussion of information observed at any child care facility must be held in the strictest confidence.

  • In the current Carrier Service SLA penalties are applied to the following attributes:• Ready for Testing date (where required)• Order completion date• Maximum response time.Despite eircom’s poor delivery performance the Director is of that view that its transformation processes should have progressed sufficiently to permit the management of ‘Order Acknowledgement’ and ‘Notification of Order Completion Date’ processes in an efficient manner.

  • New US Missile Defense Radar to be Ready for Testing by 2020 U.S. Arms Control1.

  • A) The preparation (selection of the Artworks and the participating artists) of the Exhibition.

  • Assembly Ready for Testing The briquette is fastened into one side of the shearing device, positioned so that the interface aligns perfectly between the locking mould side and the shear sleeve (Figure 3.) The distance between the clamping device and the shearing sleeve is about 5 millimetres.

  • If this is the first correction of a Fault Report reaching this state, then the Fault Report state is changed to First Correction Ready for Testing.


More Definitions of Ready for Testing

Ready for Testing when BT has satisfactorily completed the provisioning of that part of the Frame Relay Interconnect Link that is under its direct control; "Receiving Party" a Party receiving information from the Disclosing Party; "Route Augmentation" additional Capacity on an established Frame Relay Interconnect Link;
Ready for Testing when BT has satisfactorily completed the provisioning of that part of an ISH Link that is under its direct control and the Operator has been notified;
Ready for Testing when the Supplier has satisfactorily completed the provisioning of that part of an Interconnect Link that is under his direct control; "RECEIVING PARTY" a Party receiving information from the Disclosing Party;
Ready for Testing when BT has satisfactorily completed the provisioning of that part of an ISH Optical Broadband Link, OSH Optical Broadband or CSH Optical Broadband Link, and associated Backhaul Capacity if appropriate, that is under its direct control;
Ready for Testing when BT has satisfactorily completed the provisioning of that part of an ISH Link or CSH Link, and associated Backhaul Capacity if appropriate, that is under its direct control;
Ready for Testing when BT has satisfactorily completed the provisioning of that part of the BT ATM ISH Handover Link that is under its direct control;

Related to Ready for Testing

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Independent testing laboratory means an independent organization, accepted by the Contracting Officer, engaged to perform specific inspections or tests of the work, either at the site or elsewhere, and report the results of these inspections or tests.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Subsurface Borings and Testing means borings, probings and subsurface explorations, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretations of all the foregoing.

  • Covenant Testing Period means a period (a) commencing on the last day of the fiscal month of Parent most recently ended prior to a Covenant Trigger Event for which Borrowers are required to deliver to Agent monthly financial statements pursuant to Schedule 5.1 to this Agreement, and (b) continuing through and including the first day after such Covenant Trigger Event that Availability has equaled or exceeded the greater of (a) 15% of the Maximum Revolver Amount, and (b) $4,500,000 for 60 consecutive days.

  • Goods Specification means any specification for the Goods, including any related plans and drawings that is set out in the Purchase Order or otherwise agreed in writing by the Customer and the Supplier;

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • labour inspector means a labour inspector appointed under section 63 of the Basic Conditions of Employment Act, 1997 (Act No. 75 of 1997);

  • Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.

  • Debilitating medical condition means one or more of the following:

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Cannabis testing facility means an entity registered by

  • IS Specification means the Specification of latest edition with amendments, if any, up to time of receipt of tender by Corporation issued by the Bureau of Indian Standards as referred to in the specifications and / or work orders.