conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;
Improvement completion assurance means a surety bond, letter of credit,
Preconstruction services means services and other activities during the design phase.
Needs assessment means a study or statistical analysis that examines the need for ground ambulance service within a service area or proposed service area that takes into account the current or proposed service area’s medical, fire, and police services.
Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of
Impact Assessment has the meaning given to it in Clause 22.1.3 (Variation Procedure);
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;
Construction Completion means physical construction of a cleanup action component is complete.
Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.
construction site means a workplace where construction work is being performed;
Construction project means the same as that term is defined in Section 38-1a-102.
Reconstruction means the replacement of components of an existing facility to such an extent that:
Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.
Construction-in-Process means cash expenditures for land and improvements (including indirect costs internally allocated and development costs) determined in accordance with GAAP for all Properties that are under development or will commence development within twelve months from any date of determination.
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.
Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
Construction Work means any work in connection with⎯
Architect/Engineer means the person designated by the Commissioner to provide the Contract drawings and Detailed Specifications for the Work you are to perform.
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.
self-assessment means an assessment made by a taxpayer or his representative under section 28;
conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Project Architect means the professional architect or engineer employed by the Owner as architect or engineer of record for the Project and its consultants.