Comprehensive resource analysis means an analysis including,
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
Resource recovery means the recovery of material or energy from solid waste.
General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.
GLJ Report means the independent engineering reserves evaluation of certain oil, NGL and natural gas interests of the Company prepared by GLJ dated February 11, 2022 and effective December 31, 2021.
Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.
CREFC® Operating Statement Analysis Report The monthly report in the “Operating Statement Analysis Report” format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
MI Report means a report containing Management Information submitted to the Authority in accordance with Framework Schedule 8 (Management Information);
Compliance Report means, as applicable in relation to the test being conducted, a report containing the results of the Compliance Tests carried out by State Street.
Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.
Financial Monitoring Report or “FMR” means each report prepared in accordance with Section 4.02 of this Agreement;
ESDM Report means the Emission Summary and Dispersion Modelling Report prepared in accordance with the Procedure Document by Envision Compliance and dated July 3, 2007 submitted in support of the application, and includes any amendments to the ESDM Report listed in Schedule A and all up-dated ESDM Reports prepared as required by the Documentation Requirements conditions of this Certificate.
Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.
Performance Report has the meaning set out in clause 8.2;
Resource means a unique person, piece of equipment, or object that performs activities and has its schedule calculated by Application Software.
Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.
Resource recovery facility means a solid waste facility
Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Phase I Report means, with respect to any Facility, a report that (i) conforms to the ASTM Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, E 1527, (ii) was conducted no more than six months prior to the date such report is required to be delivered hereunder, by one or more environmental consulting firms reasonably satisfactory to Administrative Agent, (iii) includes an assessment of asbestos-containing materials at such Facility, (iv) is accompanied by (a) an estimate of the reasonable worst-case cost of investigating and remediating any Hazardous Materials Activity identified in the Phase I Report as giving rise to an actual or potential material violation of any Environmental Law or as presenting a material risk of giving rise to a material Environmental Claim, and (b) a current compliance audit setting forth an assessment of Holdings’, its Subsidiaries’ and such Facility’s current and past compliance with Environmental Laws and an estimate of the cost of rectifying any non-compliance with current Environmental Laws identified therein and the cost of compliance with reasonably anticipated future Environmental Laws identified therein.
Coordinated licensure information system means an integrated process for collecting, storing, and sharing information on nurse licensure and enforcement activities related to nurse licensure laws that is administered by a nonprofit organization composed of and controlled by licensing boards.
CAISO Global Resource ID means the number or name assigned by the CAISO to the CAISO- Approved Meter.
Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.
renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;
New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.