Resurrection Period definition

Resurrection Period means a period of Thirty (30) days from the date of communication of approval of an Alternate Location in respect of a Displaced or Withdrawn Location and would be a Concession Fee Holiday Period on Proportionate basis in respect of the affected locations only

Examples of Resurrection Period in a sentence

  • The Concessionaire however would not be entitled any Resurrection Period if the relocation of an Original Location to an Alternate Location has been permitted by the Authority upon the written request made by the Concessionaire.

  • The Concessionaire however would not be entitled any Resurrection Period if the relocation of an Original Location to an Alternate Location has been sought under Rationalization Rights.

  • The Concessionaire would be entitled to a Resurrection Period of Thirty (30) days in respect of Displaced, & Withdrawn Locations which have to be resurrected at an Alternate Location from its Original Location in case authority desires for relocation/with drawl.

  • The Concessionaire would be entitled to a Resurrection Period of Thirty (30) days in respect of Displaced, & Withdrawn Locations which have to be resurrected at an Alternate Location from its Original Location.

  • RFP-F&BPage 47 of 170 5.13.5 The Concessionaire however would not be entitled any Resurrection Period if the relocation of an Original Location to an Alternate Location has been sought under Rationalization Rights.

Related to Resurrection Period

  • Epidemic means a sudden development and rapid spreading of a contagious disease in a region where it developed in a simply endemic state or within a previously unscathed community.

  • Clean-Up Period has the meaning specified in Section 8.02(b).

  • Unavoidable Delays means delays due to any of the following, and only the following, (provided that such delay is beyond Construction Manager’s reasonable control): war, insurrection, civil commotion, strikes, slowdowns, lock outs, riots, flood, earthquakes, fires, casualties, acts of God, acts of a public enemy, acts of terrorism, epidemics, quarantine restrictions, freight embargoes, lack of transportation, governmental moratoriums, unusually severe or abnormal weather conditions, failure of utilities, or a court order which causes a delay (unless resulting from a wrongful act of Construction Manager). In no event shall the application to Construction Manager of any applicable law, regulation, rule or other governmental requirement constitute an Unavoidable Delay. Contractor shall use reasonable good faith efforts to notify Owner not later than five (5) days after Construction Manager knows of the occurrence of an Unavoidable Delay. An extension of time for an Unavoidable Delay shall only be for the period of the Unavoidable Delay, which period shall commence to run from the time of the commencement of the cause of the Unavoidable Delay.

  • Inclement Weather means any weather condition that delays the scheduled arrival or departure of a Common Carrier.

  • Unavoidable Delay means an event which delays Closing which is a strike, fire, explosion, flood, act of God, civil insurrection, act of war, act of terrorism or pandemic, plus any period of delay directly caused by the event, which are beyond the reasonable control of the Vendor and are not caused or contributed to by the fault of the Vendor. “Unavoidable Delay Period” means the number of days between the Purchaser’s receipt of written notice of the commencement of the Unavoidable Delay, as required by paragraph 5(b), and the date on which the Unavoidable Delay concludes.

  • Force Majeure Period has the meaning specified in Section 13.1.

  • Production Period is the period that for winter cereal advances commences October 1, 2021 and terminates September 30, 2023; for advances on all other field crops, honey, hogs, goats, sheep and lambs commences April 1, 2022 and terminates September 30, 2023; and for advances on cattle, continuous flow cattle, and bison commences on April 1, 2022 and terminates on March 31, 2024.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Riot means a tumultuous disturbance of the public peace by three or more persons assembled together and acting with a common intent.

  • Epidemic Failure means a series of repeating failures or defects resulting in at least a 0.5% failure rate for the same Product or Material during any twelve-month period.

  • Beyond use date means the date determined by a pharmacist and placed on a

  • Deadly weapon means any weapon, whether loaded or unloaded, from which a shot may be discharged, or a switchblade knife, gravity knife, billy, blackjack, bludgeon, or metal knuckles.

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • lockout shall bear the meaning given them in the Ontario Labour Relations Act.

  • Landslide means episodic down slope movement of a mass of soil or rock that includes, but is not limited to, rock falls, slumps, mudflows, and earth flows.

  • Washout means the carrying away of solid waste by waters of the base flood.

  • War means war, whether declared or not, or any warlike activities, including use of military force by any sovereign nation to achieve economic, geographic, nationalistic, political, racial, religious or other ends.

  • Unplanned Service Interruption means any Service Interruption where events or circumstances prevent the timely communication of prior warning or notice to the Trader or any affected Customer;

  • Curtailment Period means the period of time during which Seller reduces generation from the Project, pursuant to a Curtailment Order. The Curtailment Period shall be inclusive of the time required for the Project to ramp down and ramp up; provided that such time periods to ramp down and ramp up shall be consistent with the Ramp Rate designated in the Cover Sheet.

  • Prevention means measures taken before a substance, material or product has become waste, that reduce: