Retrofit Work definition

Retrofit Work means the Retrofit measures to be performed by the Participant on the Building as outlined in the Deep Retrofit Design.
Retrofit Work means the Retrofit measures to be performed by the Participant on the Building as outlined in the Deep Retrofit Design. "Statutory Declaration of Substantial Completion" is referred to in Schedule A (Reporting Requirements and Schedule) and the template attached as Form 2 in 0. "Substantial Completion Date" means the date, as indicated on the submitted and signed Form 2: Statutory Declaration of Substantial Completion by the Participant from Schedule K (Forms) to the City, in which the Retrofit Work as outline under the Deep Retrofit Design Report has been Substantially Completed.
Retrofit Work or “Retrofit Project”) on a residence owned by the Applicant(s). BANK will accept Credit Applications (“Credit App(s)”) under the Program until Program funds are fully committed as specified in the Program Term Sheet.

Examples of Retrofit Work in a sentence

  • The Participant shall have Substantially Completed the Retrofit Work on the Building by the date outlined in the Deep Retrofit Design Report attached as Schedule C, The actual date of Substantial Completion will be the date indicated on the signed and submitted Form 2: Statutory Declaration of Substantial Completion by the Participant to the City.

  • The City will pay the Participant in two separate installments of a maximum forty percent (40%) during the Claim Period of April 1, 2023 to March 31, 2024 and a maximum of forty percent (40%) during the Claim Period April 1, 2024 to March 31, 2025 to cover Eligible Costs associated with the Retrofit Work outlined under the Deep Retrofit Design Report (the "Retrofit Incentive").

  • The Participant shall begin the Retrofit Work to be completed for the Deep Retrofit Project within one hundred and twenty (120) calendar days or such other period the City may allow in writing of the City's acceptance of the Deep Retrofit Design Report, in the form of a Deep Retrofit Design Acceptance Letter set out in Schedule K (Forms).

  • The calculation of the final percentage amount to be paid will be based on the final measured emissions reduction resulting from the Retrofit Work on the Building the Participant, as further described under Schedule E (Claims and Incentives) & Schedule F (Performance Incentive Emissions Performance Limit).

  • The Participant agrees that it has no rights to any Credits or the proceeds thereof as a result of the Retrofit Work under the Deep Retrofit Project in accordance with the terms of this Agreement.

  • The City will pay the Participant a maximum of ten percent (10%) of the Incentive Limit, with the final percentage amount of the Incentive being dependent on the final measured emission reduction resulting from the Retrofit Work, during the Claim Period of April 1, 2025 to March 31, 2026 to cover Eligible Costs associated with the Retrofit Work outlined under the Deep Retrofit Design Report (the "Performance Incentive").

  • The Participant shall have completed all of the Retrofit Work on the Building, as outlined under the Deep Retrofit Design Report, by January 31, 2025, unless this date is extended pursuant to this Agreement.

  • In the event the Participant fails to commence the Retrofit Work as per the timeline outlined above, and without Written Notice requesting an extension and demonstrating a new timeline for the commencement of the Retrofit Work acceptable to the City, the City may terminate this Agreement immediately pursuant to Section 33 (Event of Default).

Related to Retrofit Work

  • Hot Work means work involving electric or gas welding, cutting, brazing, or similar flame or spark-producing operations.

  • Shift Work is defined as the same work performed by two or more employees or two or more successive sets or groups of employees working successive periods.

  • Retrofit means to alter, improve, modify, remodel or renovate a building, facility or structure to make that building, facility or structure more energy-efficient.

  • Project Work means construction work performed in the construction of a Covered Project.

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Contract Work means everything required to be furnished and done by the Contractor by any one or more of the parts of the Contract referred to in Article 1, except Extra Work as hereinafter defined.

  • Urgent Work means any urgent measures which in the opinion of Engineer-in-charge become necessary during the progress of the work to obviate any risk of accident or failure or disruption of generation which become necessary for security.

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Remodeling means the alteration, construction or remodeling of partitions, hallways, stairways and means of egress, the replacement, relocation or reconstruction of heating, ventilating and sanitary equipment.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Tenant Work All work installed or furnished to the Premises by Tenant in connection with Tenant’s initial occupancy pursuant to Rider 2 and the Workletter.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Construction Work means any work in connection with⎯

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” xxxx modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary xxxx for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • Project Improvements means site improvements and facilities that are: