Satisfactory academic progress (SAP) means earning at least six (6) non- remedial semester hours per semester if attempted hours are at least six (6) but less than twelve (12) semester hours or earning at least twelve (12) non-remedial semester hours per semester if twelve (12) or more semester hours are attempted and any other criteria as established by the eligible institution.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Satisfactory Progress means that the Applicant, including any Person with an ownership interest in the Applicant or Development Team member, has presented evidence, satisfactory to ADOH, that each Project for which the Applicant has received a Determination of Qualification, Reservation, or Allocation in Arizona or any other state, has been Placed in Service on time or otherwise is progressing without unreasonable delay through the various phases of development, i.e., financing, permitting, construction, certificate of occupancy, and rehabilitation.
Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.
Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
Environmental and Social Impact Assessment or “ESIA” means a site-specific report, to be prepared in accordance with the parameters laid down in the ESMF (as hereinafter defined) and acceptable to the Association, identifying and assessing the potential environmental and social impacts of the activities to be undertaken for the Project, evaluating alternatives, and designing appropriate mitigation, management, and monitoring measures.
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate
Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;
Timeline means the list of critical dates and actions included in the Introductory Materials.
Participating Certified Clinical Nurse Specialist means a Certified Clinical Nurse Specialist who has a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;
Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.
Feasibility Report means a detailed written report of the results of a comprehensive study on the economic feasibility of placing the Property or a portion thereof into Commercial Production and shall include a reasonable assessment of the mineral ore reserves and their amenability to metallurgical treatment, a description of the work, equipment and supplies required to bring the Property or a portion thereof into Commercial Production and the estimated cost thereof, a description of the mining methods to be employed and a financial appraisal of the proposed operations supported by an explanation of the data used therein;
CEQA means the California Environmental Quality Act.
Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.
Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;
Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.
Construction Completion means physical construction of a cleanup action component is complete.
Contracting Body Satisfaction Survey shall have the meaning set out in Clause 18.1;