SATISFACTORY COMMISSIONING definition

SATISFACTORY COMMISSIONING. , means the continuous operation of the equipment to the full capacity and establishment of its strict performance of the contractual requirement.
SATISFACTORY COMMISSIONING means the continuous operation of the equipment to the full capacity and establishment of its strict performance of the contractual requirement. Scope of the contract The SUPPLIER's scope of work comprises of the detailed design, procurement, fabrication / manufacture, inspection and testing at the works and supply of plant and machinery on F.O.R. site basis, as defined in the technical specification, with all their accessories, fittings, supports and all the auxiliary equipment and material as detailed in the specification Wherever it is stated in this contract that such and such a supply is to be effected or such and such a work is to be carried out, or provided, it shall be understoodthat the same shall be effected/carried out by the SUPPLIER within the contract price, unless a different intention is specifically and expressly stated herein or otherwise explicit from the context.2.2.3 Completeness of the equipment, within the battery limits, shall be the responsibility of the SUPPLIER. Any equipment, fittings and accessories which may not be specifically mentioned in the specification or drawings, but which are usual or necessary for the satisfactory functioning of equipment (successful operation and functioning of the equipment being SUPPLIER's responsibility) shall be provided, by the SUPPLIER without any extra cost to the PURCHASER. 2.2.4 Furnishing to the PURCHASER, foundation drawings and loading details relating to plant and machinery within the SUPPLIER's scope progressively at an agreed time schedule. 2.2.5 The SUPPLIER shall ensure that the work shall be of the first class quality and shall be performed:

Related to SATISFACTORY COMMISSIONING

  • Satisfactory academic progress means that a student passed at least three subjects at the end of the last grading period prior to the request for an enrollment certificate. If the student has not passed at least three subjects, the student will not be given an enrollment certificate and cannot get his/her driver’s license.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Satisfactory Progress means that the Applicant, including any Person with an ownership interest in the Applicant or Development Team member, has presented evidence, satisfactory to ADOH, that each Project for which the Applicant has received a Determination of Qualification, Reservation, or Allocation in Arizona or any other state, has been Placed in Service on time or otherwise is progressing without unreasonable delay through the various phases of development, i.e., financing, permitting, construction, certificate of occupancy, and rehabilitation.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Timeline means the list of critical dates and actions included in the Introductory Materials.

  • Participating Certified Clinical Nurse Specialist means a Certified Clinical Nurse Specialist who has a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.

  • Feasibility Report means a detailed report, in form and substance sufficient for presentation to arm's length institutional lenders considering project financing, showing the feasibility of placing any part of the Property into commercial production as a Mine and shall include a reasonable assessment of the various categories of ore reserves and their amenability to metallurgical treatment, a complete description of the work, equipment and supplies required to bring such part of the Property into commercial production and the estimated cost thereof, a description of the mining methods to be employed and a financial appraisal of the proposed operations and including at least the following: (i) a description of that part of the Property to be covered by the proposed Mine; (ii) the estimated recoverable reserves of Minerals and the estimated composition and content thereof; (iii) the proposed procedure for development, mining and production; (iv) results of ore amenability treatment tests (if any); (v) the nature and extent of the facilities proposed to be acquired, which may include mill facilities if the size, extent and location of the ore body makes such mill facilities feasible, in which event the study shall also include a preliminary design for such mill; (vi) the total costs, including capital budget, which are reasonably required to purchase, construct and install all structures, machinery and equipment required for the proposed Mine, including a schedule of timing of such requirements; (vii) all environmental impact studies and costs of implementation; (viii) the period in which it is proposed the Property shall be brought to commercial production; and (ix) such other data and information as are reasonably necessary to substantiate the existence of an ore deposit of sufficient size and grade to justify development of a mine, taking into account all relevant business, tax and other economic considerations including a cost comparison between purchasing or leasing and renting of facilities and equipment required for the operation of the Property as a Mine.

  • CEQA means the California Environmental Quality Act (Cal. Public Resources Code Sections 21000 et seq.) and the State CEQA Guidelines (Cal. Code of Regs., Title 14, Sections 15000 et seq.).

  • Project Architect means the professional architect or engineer employed by the Owner as architect or engineer of record for the Project and its consultants.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Psychiatric facility means a psychiatric hospital or psychiatric unit licensed under section 134.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.