Examples of Trucked Waste in a sentence
All trucks must stop at the designated location on the Agency entrance road, enter the CMSA Administration Building, and complete a Trucked Waste Record form.
If there is a discrepancy between the measured volume and the volume stated on the Trucked Waste Record form, facility measurements will be used for invoicing.
Hauled waste vehicle drivers must complete a Trucked Waste Record form for each load delivered to CMSA, including the load volume, in gallons.
All requirements and policies described in the "Trucked Waste Requirements and Procedures" are incorporated in the permit by reference; failure to comply with any one of the requirements set forth herein constitutes a permit violation.
Write the number of family members (including applicant) listed by the applicant in the “Household Members” section of the application in Line 11 - “Family Size”.Step 2.
Should the waste discharge occur during unattended periods, or during a period when the computer system is non-functional, or at the direction of the technician, the waste hauler must complete the Trucked Waste Disposal Log found in the station office.
To report compliance with this requirement, the following statement must be submitted, signed as required in the Trucked Waste Requirements and Procedures Section H: Signatory Requirements.
A Sewage Control Manager may, upon application or upon his or her own initiative, issue a Waste Discharge Permit or a Trucked Waste Authorization to a person who holds a Waste Discharge Permit or Authorization under the Former Bylaw for the same source, in which case the Waste Discharge Permit or Authorization issued under the Former Bylaw shall cease to be of effect.
Application for a Waste Discharge Permit or a Trucked Waste Authorization shall be made to a Sewage Control Manager on such forms as a Sewage Control Manager may prescribe from time to time and shall be accompanied by such information, drawings and specifications as a Sewage Control Manager may from time to time prescribe.
If the contrac- tors are required to carry the cost for connecting to the permanent power to get to each area, then we need to know what is available where.