Examples of Unspecified Work in a sentence
Measurement and Payment for Unspecified Work The work covered by this item consists of unforeseen items of work not included in other bid items, but necessary for accomplishing the work, and shall apply only to extra work or additional items over and above those specified or shown on the plans.
This work, if authorized, may be funded from the Unspecified Work provided in the titled “Unspecified Work” in these specifications.
Unspecified Work has been included in these Contract Documents to address minor work or materials not listed.
The Supervising Officer may require the Contractor to carry out additional Unspecified Work over and above that which is required by the Contract.
Unspecified Work carried out by the Contractor which is not adequately addressed under the task list may be addressed under ad-hoc rates with prior approval by the Directorate’s Representative.
Payment - The quantities of Unspecified Work to be paid for under this item shall be measured in the units of pay as agreed and approved in writing, the total of which shall not exceed the amount listed on the Bid Form for Work in place, completed and accepted.
Any portion of this Unspecified Work amount that remains after all10 authorized payments have been made, will be withheld from contract payments11 and will remain with the Owner.
Payment: The quantities of Unspecified Work to be paid for under this item16 shall be measured in the units of pay as agreed and approved in writing, the17 total of which shall not exceed the amount listed on the Bid Form for Work in18 place, completed and accepted.
Irrespective of urea granule size and soil type, the ln-N2O flux was predicted well (56%) with the combination of NO3−-N, NH4+-N, WFPS and pH (Figure 5a).==For experiment 1, surface mineral N (% share/total) was highly related to the sum of NH3 and NOx emissions (R2 0.97–0.99, P < 0.05–0.01), and total NO3−-N with the latter (R2 0.93, P < 0.05), linking to the presence of NH4+-N as well that was nitrified during the study period.
A deductive change order will be executed at12 the end of this contract prior to Final Payment to credit Owner with the remaining13 portion of the Unspecified Work amount.