Virginia assessment program definition

Virginia assessment program means a system used to evaluate student achievement that includes Standards of Learning tests and additional tests that may be approved from time to time by the Board of Education.
Virginia assessment program means a system used to evaluate student achievement that
Virginia assessment program means a system used to evaluate student achievement that includes SOL tests and additional tests that may be approved from time to time by the board.

Examples of Virginia assessment program in a sentence

  • The stricken language is no longer necessary.• In subsection F adding the language regarding the Virginia assessment program clarifies that all such assessments hold students and schools accountable for student achievement.

  • Accreditation ratings awarded in an academic year are based upon Virginia assessment program scores from the academic year immediately prior to the year to which the accreditation rating applies and on graduation and completion indexes (for schools with twelfth grade) established for the current year.

  • If the parent decides on non-participation in the Virginia assessment program, the decision will be considered a refusal to participate and the student, the school, and the school division will receive a score of 0 for that test.

  • Students shall not be required to retake the Virginia assessment program Assessment Program tests unless they are retained in grade and have not previously passed the related tests.With such funds as may be appropriated by the General Assembly, the Board of Education The boardshall provide the same criteria for eligibility for an expedited retake of any Standards of Learning SOLtest, with the exception of the writing Standards of Learning SOL tests, to each student regardless of grade level or course.

  • The clear sky curve represents an average based on measurements from the locations at normal ozone density.

  • The percentage of students passing the Virginia assessment program tests in the four core academic areas administered in the school, with the accreditation rating calculated on a trailing three-year average that includes the current year scores and the scores from the two most recent years in each applicable academic area, or on the current year’s scores, whichever is higher.

  • Schools shall use the Virginia assessment program Assessment Program test results in kindergarten through eighth grade as part of a set of multiple criteria for determining the promotion or retention of students.

  • Schools shall use the Virginia assessment program test results in kindergarten through eighth grade as part of a set of multiple criteria for determining the promotion or retention of students.

  • The percentage of students passing the Virginia assessment program tests in the 4 core academic areas.

  • Solutions containing not less than 10 per cent of cardiazol and not more than 0.5 per cent of dicodide salts.

Related to Virginia assessment program

  • Risk assessment means a programme to determine any risk associated with any hazard at a construction site , in order to identify the steps needed to be taken to remove, reduce or control such hazard;

  • Non-Administrator Ambulatory Surgical Facility means an Ambulatory Surgical Facility which does not meet the definition of an Administrator Ambulatory Surgical Facility.

  • Comprehensive assessment means the gathering of relevant social, psychological, medical and level of care information by the case manager and is used as a basis for the development of the consumer service plan.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.