Examples of Winter Capability in a sentence
A Summer Capability Period followed by a Winter Capability Period shall be referred to as a “Capability Year.” Each Capability Period shall consist of On-Peak and Off-Peak periods.
In the case of an Expansion that enters commercial operation less than 90 days before the beginning of a Capability Period, the temporary award that is effective during the Summer Capability Period (or any portion thereof) may differ from the temporary award that is effective during the Winter Capability Period (or any portion thereof).
If the ISO estimates that Incremental TCCs would be created by an Expansion it shall separately estimate the quantity of Incremental TCCs that would be created for both the Summer and Winter Capability Periods.
Partial Outage Incremental TCCs may be created between POI/POW combinations that differ from those for which the ISO may determine that Incremental TCCs would be available in a non-binding estimate or in any award of Incremental TCCs. If the ISO determines that Partial Outage Incremental TCCs may be created as the result of an Expansion it shall separately calculate the number that would be created for the Summer and Winter Capability Periods.
In the case of an ETA that will expire or terminate after the end of the 2008 Winter Capability Period, the ISO shall set the deadline on a date prior to the beginning of the Centralized TCC Auction for the Capability Period in which the ETA expires or terminates.
If the ISO determines that Incremental TCCs should be awarded, it shall make separate awards for the Summer and Winter Capability Periods.
Through the Winter Capability Period 2017/2018, the Project’s XXXX value for the Winter Capability Period will be set at a value that will maintain the same proportion of XXXX to ERIS as the Project has for the Summer Capability Period.
Each Project qualifying for XXXX will have two XXXX values per Project: one for the Summer Capability Period and one for the Winter Capability Period.
Multiple generators connected to a single bus with a total Winter Capability equal to or greater than 10.0 MW shall also be included.
The analysis shall include all generators with a Winter Capability equal to or greater than 10.0 MW.