Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.
Change Order Request means a written request or proposal for a Change Order submitted by either Company or Contractor and including:
Critical Path means those Trade Contractor Work activities identified on the Construction Schedule which, if delayed, will cause a corresponding Delay in the Substantial Completion Date.
Electrical contractor means an electrical contractor as defined in the Regulations;
Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.
Change Order means a written instrument signed by Owner and Contractor stating their agreement upon all of the following: (1) a change in the Work; (2) the amount of the adjustment in the Contract Sum, if any, and (3) the extent of the adjustment in the Contract Time, if any.
Cost of the Work means costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rates not higher than those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 6.
Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” xxxx modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary xxxx for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.
Punchlist means a list of items of Work to be completed or corrected by Contractor after Substantial Completion. Punchlists indicate items to be finished, remaining Work to be performed, or Work that does not meet quality or quantity requirements as required in the Contract Documents.
Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.
Project Scope means the description or activity of work to be accomplished on the Project.
M/WBE means a business certified with Empire State Development (ESD) as a Minority and/or Woman-Owned Business (M/WBE).
Cost of work , in table above, shall mean the agreement amount of the work.
tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;
Change Orders mean changes or modifications to any Construction Contract or any other contract with labor or material suppliers.
Work Request means a document prepared by the Contractor which describes over and above work being proposed.
Lower tier subcontractor means any party entering into an agreement with the SUBCONTRACTOR or any Lower Tier SUBCONTRACTOR for the furnishing of supplies or services required for performance of this Subcontract.
Outage has the meaning set forth in the CAISO Tariff.
drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;
Maintenance work means the repair of existing facilities when the size, type or extent of such facilities is not thereby changed or increased. While “maintenance” includes painting and decorating and is covered under the law, it does not include work such as routine landscape maintenance or janitorial services.
principal contractor means an employer appointed by the client to perform construction work;
Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.
Cost of Capital Improvement Projects means the costs of acquiring, constructing, reconstructing, expanding, improving and engineering Capital Improvement Projects, and related financing costs.
Severity 1 means the unavailability of multiple service resources and redundant capability is not available or has been exhausted.
The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.
Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;