Acceptance Testing and System Commissioning Sample Clauses

Acceptance Testing and System Commissioning. Provider shall:
AutoNDA by SimpleDocs
Acceptance Testing and System Commissioning. Provider shall: Conduct an inspection, test and commissioning procedure to insure that the System is installed in a professional manner and consistent with prudent industry practices. A record of the installation and the major components including modules, inverters, transformers and source circuit combiners will be documented in a test and commissioning report. Test and verify that all non-current-carrying metal parts are solidly grounded and all equipment and System grounding is installed and functional per NEC 2008. Test and verify that phase sequencing, fuse continuity, and open circuit voltage are within the manufacturers recommended range at the DC disconnect. Test and verify that the inverter is operating effectively within the typical start up time and record the DC operating voltage, phase currents and inverter power. Provide complete operation and maintenance manual for the System (two printed copies and one electronic copy). The manual will include: (i) as-built drawings, (ii) as-built shop drawings, (iii) a copy of any required submittals or filing, (iv) product cut sheets, (v) product operation manuals, (vi) a copy of the photo record, (vii) written Utility approval, (viii) product warranties; and (ix) supplier and installer contact information. Solar Monitoring System: Every COMPANY System comes standard with MONITORING DEVICE______ proprietary solar monitoring service. MONITORING DEVICE enables COMPANY to continuously monitor the key performance variables of the System and transmit this data to COMPANY servers through the Internet. All Purchaser systems will be accessible through a single data access including system-level and aggregated system data. Any additional third-party monitoring, network access or data feed will be cost and responsibility of Purchaser.

Related to Acceptance Testing and System Commissioning

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Detailed Scope of Work The complete description of services to be provided by the Contractor under an individual Job Order. Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.

  • 000 SCOPE OF WORK 5.100 The scope of this Agreement covers all work of a maintenance, repair and renovation nature, assigned by the Owner to the Company and performed by the employees of the Company covered by this Agreement, within the limits of the Owner's plant site.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.