Detailed Scope of Work Sample Clauses

Detailed Scope of Work. The complete description of services to be provided by the Contractor under an individual Job Order. Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.
AutoNDA by SimpleDocs
Detailed Scope of Work. The complete description of services to be provided by the Contractor under an individual JOC Task Order (JTO). Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.
Detailed Scope of Work. A document setting forth the work the Contractor is obligated to complete for a particular Job Order.
Detailed Scope of Work. The Contractor agrees to adhere to the minimum qualifications and requirements as set forth in Solicitation # SD21-00061.
Detailed Scope of Work. PACKAGE A: Disposal of Ash at pre-designated locations of Mines pit / any other locations
Detailed Scope of Work shall provide all services, materials and labor for the construction of ________________________ on the property located at ________________________, ________________________, ________________________ ________________________ hereinafter referred to as the "Worksite."
Detailed Scope of Work. A. Cleaning of Areas underneath and surrounding Fly Ash & Bed Ash Silos 1. Cleaning of Area underneath & surrounding areas Fly Ash & Bed Ash Silos on daily basis by accumulation / collection of Ash by using a JCB (of model: 3D or equivalent) / Loader (of suitable capacity). Minimum 1 No. JCB / Loader shall be Owned / Possessed by the Contractor. This accumulated / collected shall be loaded into Open Truck and transported to designated locations as directed by Engineer In- charge. Further, the Contractor shall ensure that there is no accumulation of ash in the area, which may hamper the normal truck loading process. This cleaning activity will be done daily as a routine job. Contractor shall provide the said JCB on Running Hour basis. The JCB / equivalent equipment deployed at Site shall be equipped with an Hour meter for measurement of the Running Hours for the Operation of JCB. Further, the JCB shall be retained at Site till the cleaning of Silo areas gets completed for the day. The capacity of JCB / Loader should be such that, it can load Ash in to a single axle / multi-axle trucks easily. 2. In normal day, Contractor shall keep JCB / Loader from 8:30 AM to 5:30 PM. However in case of urgency, Bidder shall make the JCB available in one hour notice other than above time, if required so. 3. Contractor shall Own / Possess minimum 1 No. single axle Open Truck for transporting the collected Ash as above to a distance of about 7 km (one side) from any of the Silos, as directed by GIPCL’s Engineer In-charge. 4. The weighment shall be done at GIPCL’s Weigh-bridge. Gate pass will be generated for each loaded trip after weighing. This gate pass copy will be the supporting document for arriving at the quantity of spilled ash removed/lifted and transported and dumped to a maximum distance up to 7 km (One side) by Contractor. At end of day, the total Ash transported shall be reconciled along with GIPCL 5. Contractor has to take tare weight & loaded weight of truck at GIPCL’s Weigh Bridge to derive net weight. Payment will be made for actual weight of ash transported in each vehicle. If Weigh Bridge is not in service or out of order, average weight transported of previous one month will be considered for billing purpose. 6. Contractor will ensure that during loading & transportation of ash, there is no spill over from truck. If any spillover of ash is there during lifting/loading or transportation, Contractor has to immediately clean the area at their cost immediately...
AutoNDA by SimpleDocs
Detailed Scope of Work. The selected IT Security Audit Agency(ies) shall be responsible for the assessment of the vulnerabilities, threats and risks that exist in website through Internet Vulnerability Assessment, Penetration Testing and Industry standard methodologies. This will include identifying remedial solutions and recommendations for implementation of the same to mitigate all identified risks, with the objective of enhancing the security of the website. The bidder will also be expected to propose a risk mitigation strategy as well as give specific recommendations to tackle the residual risks emerging out of identified vulnerabilities assessment. For each security audit, the internet link and credentials for staging environment of the web site/portal/application, accessible only to the security audit agency, shall be shared. Each instance of security audit of a web portal/application shall have the following four primary steps: RISL Rate Contract for Security Audit of Website(s)/Web Application(s)/portal(s)/Mobile App(s)
Detailed Scope of Work. (See Exhibit A)‌
Detailed Scope of Work. 1.1 The South County Regional Water Treatment Plant (SCRWTP) is requesting a not-to-exceed time and material quote to remove and replace packing material in four degasification towers located at the South County Regional Water Treatment Plant (SCRWTP). 1.2 The existing 3.5” Xxxxxx Tri-Packs will be replaced with 3.5” Xxxxxx Tri-Packs. The media material is being pre-purchased by the County and will be on site. 1.3 No work beyond this scope to be performed without approval of the appropriate County Representative.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!