Access Right to Project Results Sample Clauses

Access Right to Project Results. During the Project Period, the Participants and their Affiliated Entities have been granted a royalty-free, non-exclusive, non-sublicensable right to access Project Results necessary to carry out their tasks in the Project.
AutoNDA by SimpleDocs

Related to Access Right to Project Results

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Parent Right to Access and Challenge Student Data The LEA shall establish reasonable procedures pursuant to which a parent, as that term is defined in 105 ILCS 10/2(g), may inspect and/or copy Student Data and/or challenge the accuracy, relevance or propriety of Student Data, pursuant to Sections 5 and 7 of ISSRA (105 ILCS 10/5; 105 ILCS 10/7) and Section 33 of SOPPA (105 ILCS 85/33). The Provider shall respond to any request by the LEA for Student Data in the possession of the Provider when Provider cooperation is required to afford a parent an opportunity to inspect and/or copy the Student Data, no later than 5 business days from the date of the request. In the event that a parent contacts the Provider directly to inspect and/or copy Student Data, the Provider shall refer the parent to the LEA, which shall follow the necessary and proper procedures regarding the requested Student Data.

  • Access to Property Borrower shall permit agents, representatives and employees of Lender to inspect the Property or any part thereof at reasonable hours upon reasonable advance notice.

  • Access to Work District representatives shall at all times have access to the Work, wherever it is, in preparation or in progress. Contractor shall provide safe and proper facilities for such access.

  • Ownership Title to Project Deliverables This clause shall apply where Contractor is commissioned by the Authorized User to furnish project deliverables as detailed in the Purchase Order.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.