Additional Output of the Facility. From time to time WMRE shall provide City Light with timely updates as to possible plant expansion. If at any time
AutoNDA by SimpleDocs
Additional Output of the Facility. From time to time WMRE shall provide City Light with timely updates as to possible plant expansion. If at any time during the Term WMRE installs generation capacity at the Facility and Facility Expansion where the total generation capacity is in excess of 12.8MW and WMRE elects to sell the additional capacity, energy, and resource adequacy benefits (“Additional Output”) and the Environmental Attributes resulting from the added capacity for delivery other than for delivery and use on the site of the Columbia Ridge landfill or on real property adjoining the landfill that is owned by Waste Management of Washington, Inc or by an Affiliate of Waste Management of Washington, Inc., then WMRE shall provide City Light with a written notice establishing an exclusive negotiating period of 90 Business Days to reach agreement in principle on terms for the purchase of all such Additional Output and the associated Environmental Attributes based upon rates, terms and conditions mutually agreeable to WMRE and City Light for such Additional Output and Environmental Attributes (the “Exclusive Window”). During the Exclusive Window, City Light and WMRE shall timely and diligently negotiate in good faith with each other. Upon receipt by City Light of a written notice provided by WMRE of future availability of Additional Output and associated Environmental Attributes, WMRE and City Light shall negotiate in good faith and make commercially reasonable efforts to complete an agreement for the sale and purchase of any Additional Output and associated Environmental Attributes that is mutually acceptable to the parties and suitable for any approval process by WMRE and the City of Seattle within the Exclusive Window. Such agreement shall be completed within the Exclusive Window or a mutually acceptable alternative time frame after City Light’s receipt of WMRE’s notice. Any agreement for Additional Output may be subject to a determination of availability of transmission from the Transmission Provider for City Light to transmit the Additional Output. If WMRE and City Light fail to reach agreement on acceptable rates, terms and conditions within the Exclusive Window and the parties fail to extend the Exclusive Window, then WMRE shall be free to sell such Additional Output, and associated Environmental Attributes to third parties, provided such sale is not at materially lower rates or on materially more favorable terms or conditions to such third party than that offered to City Light. If W...

Related to Additional Output of the Facility

  • Facility Prudential is willing to consider, in its sole discretion and within limits which may be authorized for purchase by Prudential Affiliates from time to time, the purchase of Shelf Notes pursuant to this Agreement. The willingness of Prudential to consider such purchase of Shelf Notes is herein called the “Facility”. At any time, the aggregate principal amount of Shelf Notes stated in Section 1.2, minus the aggregate principal amount of Shelf Notes purchased and sold pursuant to this Agreement prior to such time, minus the aggregate principal amount of Accepted Notes (as hereinafter defined) which have not yet been purchased and sold hereunder prior to such time, is herein called the “Available Facility Amount” at such time. NOTWITHSTANDING THE WILLINGNESS OF PRUDENTIAL TO CONSIDER PURCHASES OF SHELF NOTES BY PRUDENTIAL AFFILIATES, THIS AGREEMENT IS ENTERED INTO ON THE EXPRESS UNDERSTANDING THAT NEITHER PRUDENTIAL NOR ANY PRUDENTIAL AFFILIATE SHALL BE OBLIGATED TO MAKE OR ACCEPT OFFERS TO PURCHASE SHELF NOTES, OR TO QUOTE RATES, SPREADS OR OTHER TERMS WITH RESPECT TO SPECIFIC PURCHASES OF SHELF NOTES, AND THE FACILITY SHALL IN NO WAY BE CONSTRUED AS A COMMITMENT BY PRUDENTIAL OR ANY PRUDENTIAL AFFILIATE.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • The Facility Subject to the terms of this Agreement, the Lenders make available to the Borrowers a multicurrency revolving loan facility in an aggregate amount equal to the Total Commitments.

  • Facility Access Notwithstanding any other provision of the Agreement, the Customer shall provide the Authority with such access to the Facility, and such documentation, as the Authority deems necessary to determine the Customer’s compliance with the Customer’s Supplemental Commitments specified in this Schedule B.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.