Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.
Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.
CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.
Monitoring and Review The Provider agrees to allow access to the Department for purposes of monitoring and review. This access includes but is not limited to client records, fiscal records, staffing records, policy and procedural manuals, facilities, staff, and children in care of the Department. The Department will conduct quality reviews, which may include site-based quality review visits.
Training and Orientation (a) No employee shall be required to work on any job or operate any piece of equipment until he/she has received proper training and instruction. (b) The Employer shall provide sufficient and adequate training and/or orientation to any employee working in a new or unfamiliar work area or position.
Packing and Marking All material and equipment to be furnished by the Contractor shall be packed, crated or otherwise suitably protected to withstand shipment undamaged to the destination. Each package, crate or part shall be marked plainly with the name of the consignee, shipping destination, the Owner's order number, and such other markings as are required. Complete packing lists, one copy with each package and two (2) copies by mail to the Owner at time of shipment, shall be supplied showing contents and identity of each package.
Program Monitoring and Evaluation The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”
Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.
Monitoring and Evaluation a. The AGENCY shall expeditiously provide to the COUNTY upon request, all data needed for the purpose of monitoring, evaluating and/or auditing the program(s). This data shall include, but not be limited to, clients served, services provided, outcomes achieved, information on materials and services delivered, and any other data required, in the sole discretion of the COUNTY, that may be required to adequately monitor and evaluate the services provided under this Contract. Monitoring shall be performed in accordance with COUNTY’S established Noncompliance Standards, a copy of which is attached hereto and incorporated by reference as Attachment “C”. b. The AGENCY agrees to permit persons duly authorized by the COUNTY to interview any clients and all current and/or former employees of the AGENCY to be assured of the AGENCY’S satisfactory performance of the terms of this Contract. c. Following such evaluation, monitoring, and/or audit, the COUNTY will deliver a report of its findings and recommendations with regard to the AGENCY’S conformance with this Contract’s terms and conditions to the AGENCY and/or Board of Directors’ President, and members, whenever applicable. If deficiencies are noted, a written notice of corrective action will be issued to the AGENCY which will specify deficiencies and provide a timeline for correction of those deficiencies. Within the designated timeframe in the written notice of corrective action, the AGENCY shall submit to the COUNTY’S CCC manager (“Manager”), or their designee, a corrective action plan to rectify all deficiencies identified by the COUNTY. d. Failure by the AGENCY to correct noted deficiencies, as outlined in the written notice of corrective action, may result in the AGENCY being deemed in breach of the Contract terms. e. The AGENCY shall cooperate with the COUNTY on all reviews to ensure compliance with all applicable COUNTY guidelines and requirements for general fund recipients.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.