Approved Landfill Sample Clauses

Approved Landfill. Franchisee shall be required to deposit all solid wasteSolid Waste collected pursuant to this Franchise Agreement, and not diverted through recycling, at an approved landfill site. For purposes of this Franchise Agreement, an approved landfill site is one holding a valid permit to permanently deposit municipal solid waste in accordance with all applicable laws and regulations of the United States, the State of Nevada, and the Nevada Environmental Commission, and the Washoe County District Board of Health. . It shall be the sole responsibility of Franchisee to provide for the permanent deposit of municipal solid waste collected pursuant to this Agreement, in accordance with all applicable Federal, State and Local laws and regulations. Franchisee shall comply with this requirement by operating its own landfill or by entering into an agreement with the operator of a landfill that meets the requirements of this Agreement. In the event that technology advances to the point that other options are available for the ultimate disposal of solid wasteSolid Waste that provides the potential that it may be used as a source of renewable energy or converted to renewable fuel, the Franchiseeand such other options are commercially viable and attractive for Franchisee, the Franchisee and the City will work with the regulator to obtain approval to divert solid waste collected under this Franchise Agreement to a facility providing those technologies. Franchisee shall provide through the operator of the landfill for the residents of the City of Sparks to dispose of refuse and waste matter, free of charge, at the landfill site during a one week9-day period each May that coincides with the Earth Day activities.
AutoNDA by SimpleDocs
Approved Landfill. Franchisee shall be required to deposit all Solid Waste collected pursuant to this Franchise Agreement, and not diverted through recycling, at an approved landfill site. For purposes of this Franchise Agreement, an approved landfill site is one holding a valid permit to permanently deposit municipal solid waste in accordance with all applicable laws and regulations of the United States, the State of Nevada, and the Nevada Environmental Commission. It shall be the sole responsibility of Franchisee to provide for the permanent deposit of municipal solid waste collected pursuant to this Agreement, in accordance with all applicable Federal, State and Local laws and regulations. Franchisee shall comply with this requirement by operating its own landfill or by entering into an agreement with the operator of a landfill that meets the requirements of this Agreement. In the event that technology advances to the point that other options are available for the ultimate disposal of Solid Waste that provides the potential that it may be used as a source of renewable energy or converted to renewable fuel, and such other options are commercially viable and attractive for Franchisee, the Franchisee and the City will work with the regulator to obtain approval to divert solid waste collected under this Franchise Agreement to a facility providing those technologies. Franchisee shall provide through the operator of the landfill for the residents of the City of Sparks to dispose of refuse and waste matter, free of charge, at the landfill site during a 9- day period each May that coincides with the Earth Day activities.

Related to Approved Landfill

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Off-Site Environmental Impacts Nothing in this Article will be construed to make Company liable in any way for any environmental impacts or release of Hazardous Substances affecting the Company Premises that occurs by reason of the migration or flow to the Company Premises from verifiable or documented off-site environmental impacts that is not attributable to Company’s activities at the Company Premises.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Construction Cost Budget The total cost to District of all elements of the Project designed or specified by the Architect, as adjusted during and at the end of the design phase in accordance with this Agreement and the Agreement for Architectural Services. The Construction Cost Budget does not include the compensation of the Project Design Team, the Program Manager (if any), the Construction Manager and any subconsultants, the cost of the land, rights-of-way, or financing which are the responsibility of the District.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Plans and Specifications Tenant shall be solely responsible for the preparation of the final architectural, electrical and mechanical construction drawings, plans and specifications (called “plans”) necessary for Tenant to construct the Premises for Tenant’s occupancy, which plans shall be subject to approval by Landlord’s architect and engineers and shall comply with their reasonable requirements to avoid aesthetic or other conflicts with the design and function of the balance of the Building. Landlord’s approval is solely given for the benefit of Landlord, and neither Tenant nor any third party shall have the right to rely upon Landlord’s approval of Tenant’s plans for any purpose whatsoever other than that Landlord does not object thereto under this Lease. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan submission by Tenant within 8 business days after Landlord’s receipt thereof. If Landlord fails to respond to any such submission within such 8 business day period, which failure continues for more than 2 business days after Tenant gives Landlord a written notice (the “Deemed Approved Notice”) advising Landlord that such plan submission shall be deemed approved within 2 business days of Landlord’s receipt of the Deemed Approved Notice, then such plan submission shall be deemed approved hereunder. The Deemed Approved Notice shall, in order to be effective, contain on the first page thereof, in a font at least twice as large as the font of any other text contained in such notice, a legend substantially as follows: “FAILURE TO RESPOND TO THIS NOTICE WITHIN TWO (2) BUSINESS DAYS AFTER RECEIPT HEREOF SHALL CONSTITUTE LANDLORD’S APPROVAL OF SUBMITTED PLANS.” In the event Landlord’s architect’s or engineers’ approval of Tenant’s plans is withheld or conditioned, Landlord shall send prompt written notification thereof to Tenant and include a reasonably detailed statement identifying the reasons for such refusal or condition, and Tenant shall promptly have the plans revised by its architect to incorporate all reasonable objections and conditions presented by Landlord and shall resubmit such plans to Landlord. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan re-submission by Tenant within 8 business days after Landlord’s receipt thereof. Such process shall be followed until the plans shall have been approved by Landlord’s architect and engineers without unreasonable objection or condition. Without limiting the foregoing, Tenant shall be responsible for all elements of the design of Tenant’s plans (including, without limitation, compliance with law, functionality of design, the structural integrity of the design, the configuration of the Premises and the placement of Tenant’s furniture, appliances and equipment), and Landlord’s approval of Tenant’s plans shall in no event relieve Tenant of the responsibility for such design. Tenant agrees it shall be solely responsible for the timely preparation and submission of all such plans and for all elements of the design of such plans and for all costs related thereto. (The word “architect” as used in this Section 3.2 shall include an interior designer or space planner.) Tenant shall reimburse Landlord Landlord’s reasonable out-of-pocket expense incurred in connection with the review of Tenant’s plans.

  • Current Operating Areas Where logging or road construction is in progress but not completed, unless agreed otherwise, Purchaser shall, before opera- tions cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion. Such protection shall be provided, prior to end of a Normal Operating Season, for all disturbed, unprotected ground that is not to be disturbed further prior to end of operations each year, including roads and associated fills, tractor roads, skid trails, and fire lines. When weather permits operations after Normal Operating Season, Pur- chaser shall keep such work on any additional disturbed areas as up to date as practicable.

Time is Money Join Law Insider Premium to draft better contracts faster.